Laserfiche WebLink
, ( ( <br /> � <br /> � � <br /> � <br /> F R A N K L I N F�� F��-:� �.,Pn�e �� �25 �2�-332� <br /> Suite 202 "rA;t �125 &27-6232 <br /> ENGINEERING , .� �n�. ,�,� G.��� -,�.��;r��< ,r,���.��,�„ <br /> MECh6�MCP,L CON5UL1lNG <br /> 3 i ���-c�a-1 <br /> April 14, 2010 <br /> ENVELOPE SUMMARY <br /> RE: WA Automated — Bldg B <br /> Seaway Center, Lot 3C <br /> Everett, WA <br /> Conversion of existing Warehouse area into conditioned Office space. Project complies <br /> with 2006 WSEC usiny the Component Performance approach with heating by Other <br /> Fuels. <br /> Vertical Glazing: Double pane, 1/2" space Air, low-e10701, fixed. Or certified tested <br /> assembly per NFRC. U =0.55, default (Table 10-61. SHGC=0.45. <br /> Doors (Opaque►: Wood, U=0.50, default (Table 10-6). <br /> Other Roof (T-bar Ceilingl: R-30 batt insulation. U=0.037, calculated. <br /> Other Roof (GW6 Ceilingl: R-30 batt insulation in metal framing. U =0.076, calculated. <br /> Wall #1 (Opaque, Exterior, Floor to Ceilingl: Concrete, min. 6" thick, furred with metal <br /> studs, 3-1 /2", 24" oc with R-15 batt insulation, U=0.101, calculated. <br />� Wall #2 (Opaque, Office/Warehouse►: Metal studs, min. 5-1/2", 24" oc with R-21 batt <br /> insulation, U =0.09 default (Table 10-5A). <br /> Wall #3 (Opaque, Parts/Office ceiling ht changel: Metal studs, min. 3-1/2", 24" oc with <br /> R-15 batt insulation, U =0.102 default (Table 10-5A1. <br /> \/ I <br />