Laserfiche WebLink
( i <br /> — <br /> — — <br /> � <br /> F R A N K L i N ,�-� F���:�� A�,en�P �_ �z5 nz�-332� <br /> _.ui;e ZOZ 'AY �G� SL7-F2�C <br /> ENGINEERING � �� nG .�,,: �����.�j . «;<,=r��< ,�o�,.�,m <br /> �necri,�wcP.� cor�su�r�r�� <br /> 1�, l �v 5 �G�"� <br /> May 14, 2010 <br /> ENVELOPE SUMMARY <br /> RE: Advanced VaporTechnology <br /> Bldg A, Seaway Lot 3C <br /> Everett, WA <br /> Conversion of existing Warehouse area into conditioned Office space. Project complies <br /> with 2006 WSEC using the Component Performance approach with heating by Otner <br /> Fuels. <br /> Vertical Glazing (Exterior): Double pane, 1/2" space Air, low-e 'o.'o' fixed. Or certified <br /> tested assembly per NFkC. U =0.55, default (Table 10-61. SHGC=0.45. <br /> Vertical Glazing (Re-litel: Double pane, any size air space. Or certified tested assembly <br /> per NFRC. U=0.90, default (Table 10-61. SHGC=exempt. <br /> Doors (0paque►: Insulated metal or Wood, U =0.60, defauit (Table 10-6). <br /> Other Roof #1: R-30 batt insulation on T-bar ceiling. U =0.037, calculated. <br /> Other Roof #2 (Restroomsl: R-30 batt insulation in metal framing over GWB ceiling. <br /> U =0.037, calculated. <br /> Wall //1 (Opaque, Exterior, Floor to 9'-0" AFF): Concrete, min. 6" thick, furred with metal <br /> studs, 3-1/2", 24" oc with R-13 batt insulation, U =0.107, calculated. <br /> Wall #2 (Opaque, Stair 102 & Ceiling ht change at Office/Parts1: Metal studs, <br /> min. 3-1/2", 24" oc with R-13 batt insulation, U =0.108, default (Table 10-5A1. <br /> �� 1 <br />