Laserfiche WebLink
I. If the 6-I zoned property at die corner of Glenwood and Mertill Creek Parkway develops with residential uses, <br /> the applicant must voluntarily mi[igate impacts to the Mukilteo School District in a manner acceptable to the <br /> District. A written letter or agreement must be provided ro the Ciry by[he School District or xpplicant prior to <br /> issuance of permits for the propeiTy. If:ui agreement is not provided, add�tional SEPA review will be required. <br /> (SBPA Public Services Policies) <br /> 5A PARKS AND RECREATION <br /> 3.�1.1 Threshold <br /> Nonc <br /> 8.�1.3 Mitigation Mc�sures <br /> I. When a trail system plan is adopted as part of the City's Comprehensive Plan,and when development is <br /> proposed on a parcel on or adjacent to a proposed trail per tl�e adopted plan, there must be compliance with the <br /> trail system plan. (SGPA Land and Shoreline Use and Transportation Policies) <br /> S.5 COG1VIUNICATIONS <br /> 8.S.I Threshold <br /> Most commimiwtion facilities are exempt from SEP.4 review. This SF.PA anatysis covers all a6oveground <br /> communication facilities providcd that view analysis is completed in the Special �roperty Use permit process. <br /> This analysis does not cover any structure that the PAA determines may have a sienificant adverse affect on <br /> navigable airspace aramd Paine Field Airport. <br /> 8.5.3 Mitigation Mcasures <br /> I. All communication lines must be installed underground. (SEPA Public Services and l.and and Shoreline Use <br /> Policiesl <br /> 2. The Special Property Use pe�mit process for aboveground utilities must include analysis of impacts to views <br /> from the proposed facilities. In addition, Special Property Use permits should only be approved when the <br /> design of the aboveground communication (acilities are compatible with nearby strucwres and/or screened from <br /> view. (SLPA Public Services and Land and Shoreline Use Policies) <br /> 3. Antennae and tower proposals and all proposals for structures to be added to the top of existing buildings: the <br /> FAA must be notified prior to issuance of a determination of consistency to derermine if the strucmre will affect <br /> navieable airspace. All rocommendatio�s of the FAA must be complied with. (SEPA Land and Shoreline Use <br /> Policies) <br /> 8.6 PUI3LIC �YATGR SUI'PLIES <br /> 8.6.1 Threshold <br /> l'I;e analysis in the I Pater Sys�em Plnn proiected the over�ll fumre peak-hour demand for the area at 2.7 gpm/acre <br /> (approximately 4,000 gpa/day peak flo�v), and assumed fire floa�requirements of approximately 3,500 gpm ior <br /> commercial and industrial/manufacturing uses. aased upon the proposed design of ilie water system, any <br /> development using more than 2.7 �pm/acre h�s the potential tu affect�s�ater prcssure on other sites. Additional <br /> analysis �sill be required for developr:ent proposals with a peak hour demand above 2.7 gpm�acre and/or a fire (low <br /> IS <br />