Laserfiche WebLink
, <br /> i + '� <br /> ��� �� <br /> �� � �/A�g"D.3� <br /> �� _ _ �_ . _� _ ,_ _, _� <br /> �: .�� r��:':^ P,��nu� �. —G.. — , <br /> F_R A N K L I N �� ��e z�2 A:t ,�� ��,-E��,� <br /> ENGINEERING � ; � � �;��� -�,-< ��.-, ::,., <br /> ti^�L-Q IA��:ICAL CJM5UL1iP:G <br /> AUgUst 25, 2010 <br /> ENVELOPE SUMMARY <br /> RE: LBC Bakery <br /> Seaway Lot 3C, Bidg A <br /> Everett, WA <br /> Conversion of existing Warehouse area into conditioned Office space. Project complies <br /> with 2006 WSEC using the Component Performance approach with heating by Other <br /> Fuels. <br /> Vertical Glazing: Double pane, 1 /2" space Air, low-e1010j, fixed. Or certified tested <br /> assembly per NFRC. U -=0.55, default (Table 10-61. SHGC=0.45. <br /> Doors (Opaque): Wood, U =0.50, default ITable 10-6). <br /> Other Roof (T-bar ceiling►: R-30 batt insulation. U =0.037, calculated. <br /> Other Roof (GWB ceiling at Restrooms): R-38 batt insulation. U =0.062, calculated. <br /> Wall #1 (Opaque, Exterior): Concrete, min. 6" thick, furred with metal studs, 3-1/2", 24" <br /> oc with R-15 batt insulation, U =0.101 , calculated. <br /> Wall J12 (Opaque, Office/Warehousel: Metal studs, min. 5-1 /2", 24" oc with r�-21 batt <br /> insulation, U =0.09 default (Tabie 10-5A1. <br /> Wall #3 (Opaque, Furr over Glazing): Metal studs, min. 3-1/2", 24" oc with R-15 batt <br /> insulation, U =0.102 default (Tabie 10-5A1. <br /> Slab on Grade: No Insulation, F=0.73, default (Tabfe 10-21. <br /> Please note that these values are minimum insulation req�irements for code compiiance. <br /> Higher insulation values may be installed. SHGC = Solar Heat Gain Coefficient <br />