Laserfiche WebLink
�• � , <br /> . <br /> � <br /> � � <br /> �� <br /> FRANK L i N =,� F���:� A,�n�� ��; �2� �z�-3��� <br /> _ ��re 2G2 'r A ( k25 F�27-6252 <br /> ENGINEERII�G ��-� ��an� ��,� ���,=�� r�,. ,��=r��,������_�,.���n <br /> MLCHANICAL CONSULIING <br /> �/00� (-�:�,�) <br /> April 15, 2U10 <br /> ENVELOPE SUh�IMARY <br /> RE: WA Automated — Bldg A <br /> Seaway Center, Lot 3C <br /> Everett, WA <br /> Conversion of existing Warehouse area into conditioned Office space. Project complies <br /> with 2006 WSEC using the Com{�onent Performance approach with heatinc� by Other <br /> Fuels. <br /> Vertical Glazing� Double pane, 1/2" space Air, low-ej0•t0j, fixed. Or certified tested <br /> assembly per NFRC. U =0.55, default (Table 10-6). SHGC=0.45. <br /> Doors (Opaque): Wood, U=0.50, default (Table 10-6). <br /> Other Roof (T-bar Ceilingl: R-30 batt insulation. U =0.037, calculated. <br /> Other Roof (GWB Ceiling►: R-30 batt insulation in metal framing. U=0.076, calculated. <br /> Wall #1 (Opaque, Office/Warehouse & Demising►: Metal studs, min. 5-1/2", 24" oc with <br /> R-21 batt insulation, U =0.088, calculated. <br /> Slab on Grade: No Insulation, F=0.73, default (Table 10-21. <br /> Please note that these values are minimum insulation requireinents for code compliance. � <br /> Higher insulation values may be installed. SHGC = Solar Haat Gain Coefficient �`;�"t ' <br /> � <br />