Laserfiche WebLink
Work Activity Work Order P3`�� 4 <br /> izieizoo io:ae <br /> ISSUBd By � CAG CRUM,GERRY <br /> Issued Department vw PUBLIC WORKS <br /> Date Issued ananoos <br /> Fund aot Account 5 Program »o Function its Activity s» <br /> Program <br /> Tl�le TAP 8 INCH 6003 23RD DR W 770119673 <br /> v�ur!:Order No Z���OZs� Project Activity Type CORRECTIVE MAINTENANCE SIBIUS CL <br /> Date 3i2ai2oo7 Time os:os Original WO 2oo�o2sa BiLinq <br /> P PTN PINON,THOMAS N. 6 � OS/29/2007 <br /> P SJT2 SPOONER,Jr�.ME5 T. 6 �05/29@007 <br /> P SDD2 STALLINGS,DO`�FID D. 6 � OS/29/2007 <br /> P SDK STUART,DARRELL F:. 6 � 05/29/2007 <br /> P BGM2 BEUKERS,GEORGE M. 5 �! 08123I2007 <br /> P CSG CAVANAH,SIiANE G. 5 � 08123I2007 <br /> P GTJ GALLAGHER.THOMAS J. 5 � 08123/2007 <br /> P JJM JESMER,JEFFREY M. 5 � 08/23l2007 <br /> P PTN PINON,TtiOMAS N. 5 � 0�3l23/2007 <br /> P SDG SMITH,DAVID G. 5 � 08�23l2007 <br /> P SJT2 SPOONER,JAA4ES T. 5 � 08/23/2007 <br /> Total Personnel Cost St,»s.eo <br /> Tot81 Cost 54,614.65 <br />