Laserfiche WebLink
� i� ..�i �v.... �.. . i.. i nn �c�c��oi�� WJvovivc� <br /> 1. The Palio�ving Best �lenegement Practices(B�iPs)must be foi!ow�ed for alt consmtction work through snd <br /> immediately adjacent to em�iroan,entelly sens�ti��e areas and their buffers,unless otherwise required by a <br /> permit issued by a federal or state agency, <br /> •1Vork should be done in the dry season whenecerpo5sible (June 1� to September 15), <br /> • The n idth of the corridor rhrough the wetland or stream should be minimized. <br /> • Construction staging areas tttust he located ou[side of environmentally sensitive azeas and their bttffets, <br /> unless determineo by tha Plar,nin¢ Director to be infeasible. Ssrenms,wedands, buffers, staging arees and <br /> construction limits shall be clearly shown on consauction plu.�s. Construction limits shall be clearly <br /> marked in the field ���ith orange eonstruction fencing. <br /> . Work shall be done so as to minimize turbidity, erosion, and other�vater quslity impccts. <br /> • Proper erosion and sediment control measures shall be followed to prevent sediments from entering creeks <br /> or�vedands. Erosion control measures shall be spproved by the Depattment of Engineering and Public <br /> Szrvices and'ar agencies �vith jurisdiction. Measures may include, but noc be limired to, plecing plywood <br /> a:.ross the area where equipment«•ili operate; mulching the wetland areas whem equipment will operate; <br /> placing��-ood chips a�op a tlexible mar to help prevent compaction (the wood chips and mat must be <br /> removed following construction); placing silt fences and hay bales benveen construction areas and all <br /> acjacent wetlands and streams; and placing ecology bloeks 6enveen eonstruction ereas snd sVeams ur <br /> wetlands when a temporary fill is used for roads, etc. <br /> � Erosion control measures shall be in piace and inspected prior to commencement of w�ork. Ail erosion <br /> contral structures shull be inspected regulerly to ensure they are muintained in�vo�king order, <br /> • 1f the �oRidor needs to 6e de��atcred to do ihe work, the water should be pumped to a sedimentation pon� <br /> whara ull solids car. settle or an area where it cen sheet flow before 6eing dischazged back to the streem or <br /> ��•etland. Turbidit}� le��els in associa[ed wedands and strearns shall not exceed the standards in WAC 173- <br /> '_0lA. <br /> • �ny exca�ation materials must be placed in an upland area during construction. Wetland soils must be in <br /> separate piles from upland soils. After constructirn, wedand soils should be retumed to the Hetland nnd <br /> upland soiis placed in upland areas. At a minimwn, the top I S inches oftopsoils from wecland areas shall <br /> be s[ored separately from the rest of the soils and replaced as the top la1'er of ftll in the wetlands follo�ving <br /> constr',ction. Care must be taken not to make "dams" from compacted fiil that would alter eny subsurface <br /> flo��'. <br /> � lf a pipe is being trenched thrcugh �he area, measures shall be taken to prevent the de-waterin;ofthe <br /> wedand (e.g. cut ofi eoilnrs, ete,). <br /> • �Vhen operating machinery in or near water, e�treme care shall be taken to pravent any petroleum products, <br /> cement, chemicals, or other toxic or deleterious materials from entering the���ater, If a spill does occur, <br /> work shall be scopped immediately anZ Ecology's 5pill Response Section centacted. <br /> • Equipment maintenance =.hall not occur in or adjacent to wedands and streams. <br /> • A":;cons[ruction, the site must be returned to its original grades. Care must be taken to not drain <br /> wetlands or alrer N�ater flows or patterns, <br /> � a <br />