My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6003 23RD DR W 2018-01-01 MF Import
>
Address Records
>
23RD DR W
>
6003
>
6003 23RD DR W 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2019 10:03:30 AM
Creation date
4/1/2017 10:13:13 AM
Metadata
Fields
Template:
Address Document
Street Name
23RD DR W
Street Number
6003
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, ,, ., �..� ,_ .� , ,,,. ,����,�„� �. , ., .�� <br /> OTHER REQUIREMENTS <br /> 1. Public �Vorks Permit is required fer this project. Detailed draw�ings in accordance with City <br /> Design and Construction 5tandards shall be submitted to the Public Works Department, showing <br /> site parking layout, landscaping, utilities, storm drainsge, temporary construction erosion control, <br /> and all required improvements in the public right-of-way, Public Works Department approval of <br /> che5e dra�vings is required prior co any permits being issued. A11 impro��ements shall be <br /> comnleted, approved and �vananted before the Occupancy Permit is issued. <br /> ?. Parking must be per Cit�� Zoning Code and City Design and Constniction Standazds for <br /> Developrrent, <br /> 3. Any gradiner£Il on this site shail be done so as to not impact the surrounding propenies. <br /> �l. This project must comply �4�ith the current City of Everett Building Code and Sprinkler <br /> Ordinance. <br /> �, 5pecial charges for connection to the sew•er and water systems in accordance with Ordinance <br /> 1998-94 and subsequent revision are applicable. 1'hese chazges are based on projected w•ater <br /> usage and can be substantial. Applicant is encouraged to obtain a copy of the Ordinance and <br /> determine estimated char@es prior to building permit application. The actual charges shall be <br /> computed b}� d�e Public Vb'orks Department per the ordinance in effect at the time and according <br /> to the information on the approved plans at the time of building permit issuance. <br /> 6. Lack of comment on the plans submitted with the application does not canstitute approval of <br /> these plans. <br /> 7. A fira h��drant is required within ?00 driving feet but not closer than SQ fee; ef every structure. <br /> 8. City streets are ro be kept clear of dirt and debris at all times during construction. Dust <br /> suppression and street cleaning must occur as directed by the Public Works Inspector. <br /> 9. On-site wa[er main �ti�ill be staked�vithin an e�sement to the City. The easement will be <br /> submit:ed to the City prior to issuance of permits. <br /> l U, As•builts of storm seu�er, sanitary sewer, nnd �+�ater sys�ems will be required ro be submi[ted per <br /> City Design snd Construction Standards and 5pecifications for Development, <br /> 1 l. Any broken or damaged sidew•alk shall be repaired.�replaced per the City Public �1%orks Inspector. <br /> l'_. i�'alk«�ays must be pro��ided from the building entrance to the public sidewalk. <br /> l3. S[orm w•ater n•eatment is required when �,000 squaze feet or more of hydraulically-connected <br /> pa�ement is creaced and/or developed by a projecc. Treacment of storm tivater runoff from <br /> hydr�ulically-connected pavement must occur, per Ciry standards; prior to discharge of the storm <br /> H•ater from the site, or to s steam, �vetland, or underground infiltration system. <br /> l6 � <br />
The URL can be used to link to this page
Your browser does not support the video tag.