My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6003 23RD DR W 2018-01-01 MF Import
>
Address Records
>
23RD DR W
>
6003
>
6003 23RD DR W 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2019 10:03:30 AM
Creation date
4/1/2017 10:13:13 AM
Metadata
Fields
Template:
Address Document
Street Name
23RD DR W
Street Number
6003
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UtiliHes Division,3200 Cedar Sheet <br /> Everett WA 98201 <br /> 425-257-8$00 <br /> Reccipl N Date Paid <br /> ✓ Cost of 1Nork Ordcr 2,708.00 Work Order# <br /> Cost of Service Order Service Order H <br /> ConWct Person John Andcrson Telephone N 425 951-4894 <br /> Kequcslcd 13y Gordon Witcher llate of Request 3-5-07 <br /> Properl}'O���ncr(natnc) TOC Management <br /> Charge Cosl lo(name if di((erenl than o���ncr) <br /> nddress 6825 S.W. Sandberg St City Tigard, OR %ip 97223 <br /> Inslallalion I.ocnlion 6003 23`d D�WCSt <br /> Installntiun typc,/desoiption/sir.c/c�c #3- 8" tap. Install tapping sieeve and control valve, make <br /> hot tap. Make final connection after purity. Contractor to expose, shore, restore. <br /> ❑ '1'he following estimate is base�l upon the Utilities Uivision providing all IaUor, equipment, <br /> malcrials, restoration,an�l (inal hook-up. <br /> Please uotifv the City of Iivcrett Utilities Division 10 workin� days in advance of required installatiun <br /> date to allow for schedidi��and �rts_procurement <br /> Whene��cr the estimated cost is not ;ufficient to cover the total expense for labor, material, equipment rental and <br /> administralive costs, the deficit shall be charged to the property for which such installation was made and the <br /> owncr lhcrcof, and provided (urther, Ihat any excess payment shall be retumed to thc person applying for the <br /> inslailation. <br /> *Dcposil nn�st bc paid prior tu ordcrin}� parts or scheduling work. <br /> WATER MI:'TERS 3" AND LARGER MAY HA VE A SIX TO 90 WEEK LEAD TIME. <br /> cr. 131dg. Pcrmit Centcr <br /> Ma�cri�il 1,379.00 �lark Sndler <br /> Kirk I3rooks <br /> I.abor;md 13cnrlits 912.00 Gordon Witdier <br /> li� ui micnl Rcn�al 370.00 �Z�bcrt 1Naddlc <br /> I I -- \latt 4Velborn <br /> I'a� 47.00 Benyam Slephanos <br /> 'f0'PAL --- $2,708.00 G�rryGum <br /> ------ — DennisRobcrson <br /> Prcp;ucd h�: Gerry Crum��,j �Go<— Da�c I:s�imn�c PrcpareJ 3-6-07 <br /> ,�cccplcd h�: Rcpresenting <br /> r,s�rin�A"fF. GOOD FOK G �IONTHS <br /> . _,. , , .�,,__�� .,,< �,�� �.�,�....,��,�,�,,,� _��r_� <br />
The URL can be used to link to this page
Your browser does not support the video tag.