Laserfiche WebLink
— — I� <br /> �� �� <br /> �� �� � �a('JCa-d� <br /> � <br /> F R A N K L I N 625 Fourth Avenue PH 425 827-3324 <br /> Suitc 202 F�X 425 827-6252 <br /> ENGINEERING Y.irkland, WA 98033 hvac(�franklineng.cum <br /> MEGHIINIC�L CANSULT]NG <br /> September 5, 2012 <br /> ENVELOPE SUMMARY <br /> RE: ELKI <br /> Norpro Bldg B <br /> Everett, WA <br /> Conversion of existing semi-heated Warehouse area into conditioned space. Entire <br /> tenant space is condkioned (Offlce and Warehouse). Projed complies with 2009 WSEC <br /> using the Component Performance approach. <br /> Other Roof: R-32 rigid irssulation above roof deck. U=0.031, default(Table 10-7G). <br /> Wall #1 (Opaque, Office Exterior, Floor to 9'-0"AFF): Concrete, min. 6" thick, furred <br /> with metal studs, 3-1l2', 24' oc with R-15 batt insulation, U=0.101, calculated. <br /> Wall #2 (Opeque, Exterior, 9'-0" AFF to Roof at Office, Floor to Roof at Warehouse): <br /> Concrete, min. 6" thick, with R-19 batt insulation stickpinned to concrete, U=0.053 <br /> calculated. <br /> Wall N3 (Opaque, Top of Overhead doors at East Wall to 4 ft): Concrete, min. 6" thick, <br /> no insulation, U=0.61 default(Table 10-5B(1)). <br /> Wall 114(Opaque, Demising Wall): Metal studs, min. 6`, 24" oc with R-21 batt <br /> insulation, U=0.09 default (Table 10-5A(1)). <br /> Doors (Opaque): Insulated metal, U=0.60, default <br /> (Table 10-6). <br /> M�e �w_ <br /> Floor Ov�r(Entry Soffit): Metal joirt, 24"oc with � �'O� <br /> R-15 batt insulation. U=0.12, default(Table 10-4A). <br /> Slab on Grade: No Insulation, F=0.73, default <br /> (Table 10-2). �,6 <br /> ALt`'-� <br />