My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1909 23RD ST 2016-01-01 MF Import
>
Address Records
>
23RD ST
>
1909
>
1909 23RD ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2017 10:39:21 AM
Creation date
4/1/2017 10:39:13 AM
Metadata
Fields
Template:
Address Document
Street Name
23RD ST
Street Number
1909
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' � <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. Connecl side sewer per City Standard#601. <br /> 5. .^•onnect side sewer per City Standard #'s 601, 602, 604. <br /> � Connect all rooflop downspouts to the side sewer. <br /> 7. Connect rooftop downspouts to the drainage system provided for this lot. <br /> B. Rooftop runoff must be discharged lo a roof downspout infiltration system per City of Everett Storm <br /> h4anual 3-2.62. The approximate size trench is 3.5' wide, 2'deep and 25' long. See attachment for <br /> more details. <br /> � The contractor must meet wilh the Public Works Inspeclor to discuss potential drainac�e routing prior to <br /> beginning the project. <br /> 10. Install erosion control measures as determined by the Public Works ir�spector, such as silt fence, straw <br /> bales, sw2les, or erosion blankets. <br /> 11, Install erosion control measures per Ciry of Everett Standards for small parcels <br /> 12> Remove e:osion conlrol measures upon completion of the project prior to final approval of the permit. <br /> 13. All excavated malerial froin (oundation, sidewalk and driveways shall be hauled to an approved, <br /> permilted sile. No wasling of material is allowed on this building lot. <br /> 14 No dirl, mud, rocks or debris to be tracked onto roadway. <br /> 15. � No building materials to be stacked on sidewalks and sidewalks to be kepl clean and open for <br /> pedestrian iravel. <br /> 16. Adjust waler meler box 1" above sidewalk grade. <br /> 17`� Remove and replace curb, gutter and sidewalk as per City of E�erett Standard Flan#'s 305A & 306 on <br /> this proposal's frontage as directed by lhe Public Works Inspector(i.e. all unuse:l driveways and any <br /> broken or damac�ed area musl be replaced). <br /> 18. Install a Type I concrele driveway per City of Everett Slandard #307. <br /> 19. Pave driveway from the front property line out to the slreet paving. <br /> 20. Contact tl�e Water Dislrict for connecting provision�for this buiiding's water and <br /> sewer services. <br /> 21. A catch hasin as per City Standard Plan#402 with a gas trap per Standard Plan#410 is required for the <br /> parking area. <br /> 22. If a sewer pump system is to be installed, the pressure line must discharge inlo a private manhole, then <br /> gravity Flow across the public right-of-way. <br /> 23. A sprinkler system is requirod for lhis building in compliance with the requiremei,ts of NFDA Standards <br /> 13D. <br /> PINCommen�s � Y <br />
The URL can be used to link to this page
Your browser does not support the video tag.