Laserfiche WebLink
,, + ( ' I' <br /> � �_ <br /> Ltr. W.Waring(B0305-048) <br /> June 4, 2003 ' <br /> Page 2 , <br /> 9. Engineering shows different confi�uration of gazage addition than plans. Please clarify. II <br /> 10. Engineer to verify requirements of str�ctural calwlations are on plan set. <br /> Please prepare a response letter showing where each item in this correction letter is addressed on the <br /> plan set. <br /> Upon resubmittal of the drawings, your application will be given priority and plan review will <br /> recommence. <br /> All required submittals shall be of sufticient detail and contain sufficient information to ensure that <br /> the proposed structure will be constructed in compliance with all adopted codes. <br /> Sincerely, <br /> i����� <br /> Jeff Heilman <br /> Developm�nt Technician <br /> DFDVPL�CKMSIR/IffM1�N/BWUS-01t(8108 7�TM DR SE� \�7// <br /> �� <br />