My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10008 25TH AVE SE 2016-01-01 MF Import
>
Address Records
>
25TH AVE SE
>
10008
>
10008 25TH AVE SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2017 11:59:08 AM
Creation date
4/1/2017 11:58:52 AM
Metadata
Fields
Template:
Address Document
Street Name
25TH AVE SE
Street Number
10008
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUL-7B-02 13� 34 FROM�CIiY OF EVERE7T CHIP [D�926457B62B PAGE 7/9 <br /> C ( <br /> (12) The Plannfng Director may require review by an expert third party who is <br /> approved by the City and the Applicant, to be paid for by the Applicant, <br /> when needed for review of sit�specitic data submitted by the Appticant <br /> conceming technical aspects related to specific facillUes and locations. <br /> 20 7he landscaping design and compatibility viith surrounding properties have been <br /> addressed in previous f)ndings. <br /> 21. The switching equipment will be housed within the proposed structure. 7he <br /> complimentary elements, including the diesel fuel tank and the HVAC <br /> condensing un(ts, will not be under-ground or wfthin the strudure. However, <br /> screening of the tank and the location of the HVAC would reduce the noise <br /> impacts tc±the surrounding properties. (exhl6k 1, Tyler testimony) <br /> 22. The facility is designed to the lowest helght possible and will be consistent with <br /> the existing struc?ure. (exhibit 1, Ty/erteslimony) <br /> 23. No new towers are proposed. (exhibit 1) <br /> 24. The propcsed telecommunications facility has not been designed fqr wlocation. <br /> The type of activity occurring on-site is not the typical tetecommunications activity <br /> that supports or can have colocatfon. (Tyler testimony) <br /> 25. The proposed facility does not require safety lights by the FAA. (exhibR 1) <br /> 26. The proposed project is not required to have an independent technical analysis. <br /> (exhibit 1) <br /> JurisdicHon: The Hearing Examiner of the Ci�y of Everett has jurisa;'ctional auihority to <br /> hold a hearing and to Issue the declsion. That authority Is set/orth In EMC 2.23.120. <br /> eased on the above Findings of fact, tha Hearing Examine�enter� the foJlowing <br /> Conclusions: <br /> CONCLUSIONS <br /> 1. The Applicant requested a Special Pmperty Use Permit for the constructfon of a <br /> 1,053 square foot addition to an extsting telephone switching building at 10008 - <br /> 25th Avenue S.E., Everett,Washington. The improvements to the site would <br /> include a new HVAC system, emergency generetor, an above-ground fuel tank, <br /> and a reconfigured parking lot. (finding 1) <br /> 2. In order for a telephone sw8ching building to be located in an R-1, Single-Family <br /> Residential zone, a Special Property Use Permit is required. See ELUC, Cha{�ter <br /> 5, Table 5.2. <br /> � 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.