My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10008 25TH AVE SE 2016-01-01 MF Import
>
Address Records
>
25TH AVE SE
>
10008
>
10008 25TH AVE SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2017 11:59:08 AM
Creation date
4/1/2017 11:58:52 AM
Metadata
Fields
Template:
Address Document
Street Name
25TH AVE SE
Street Number
10008
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUL-IB-04 13�35 FROM�CI7Y OF EVER£Ti CHIP ID�q2i2i79B�B PAGB 8/8 <br /> • � � . <br /> these drawings is required prior to any pertnks being issued. Atl improvements <br /> shall be completed and approved warranted before the Occupency Pertnit is <br /> issued. <br /> 10. The fuel tank must be installed in accordance wffh ail applicable City standards. <br /> 11. This project must compty with the cuRent City of Everett Building Code and <br /> Sprinkler Ordinance. <br /> 12. City streets and alleys are to be kept clear of dirt and debris at all tlmes during <br /> construction. Dust suppression and street cleaning must occur as directed by <br /> the Public Works inspector. <br /> 13. Any broken and damaged sidewalk shall be repaired/replaced per the City Public <br /> Works Inspector. <br /> 14. All exposed ground must be reseededAandscaped within 30 days of the <br /> completlon of construction. If reseeding is not practical due to weather or <br /> seasonal problems, the ground must be covered with mulch as directed by the <br /> City Engineer. <br /> 15. Temporary erosfon control measures for construction activity must be operational <br /> prior to commencement of any clearing or earthwork. <br /> 16. The proposal shall c- nply with all SEPA Mitigation requirements in SEpA MDNS <br /> #02-018. <br /> 17. Any gradingffill on this site shall be done so as to not impact the surrounding <br /> properties. <br /> 18. Any noisy equipment shall be located on the portion of the site or(ented away • <br /> from the adjacent single-fam(ly residences, The Applicant may be required to <br /> provide an analysis of existing and proJected sound levels at tha t(me of building <br /> permit application, depending upon the location and type equipment used. <br /> Done and dated this 18th day of July, 2002. <br /> � �i• �D,�� <br /> Jam . Driscoll <br /> Hearing Examiner <br /> /q <br /> .. ( <br />
The URL can be used to link to this page
Your browser does not support the video tag.