Laserfiche WebLink
� ' ' INSP'FGTION REPORT x <br />� <br /> Address ''� �3� �'����� <br /> # �p.�J Contractor <br /> Owner <br /> , � <br /> i <br /> Date � — <br /> APPROVAL O PARTIAL APPROVAL <br /> p VIOLATION ❑ CORRECTION REQUESTED <br /> ❑Corrections listed 6elow MUST BE MADE before work can he approved. <br /> ❑Please contact inspector and arrange for appointment. <br /> ❑Was not able to peAorm inspection. <br /> 7 CALL 259-8810 FOR REINSPECTION-24 hour notice required <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br /> ON THE PREMISES PRIOR TO OCCUPANCY. <br /> _ i <br /> Inspecror <br /> Date <br /> PE INSPECTION RE�UESTED <br /> 0 Temp. le ❑Framing C]Gas Piping <br /> ❑ Footing ,Dryw411,Nailing ❑Consultation <br /> 0 Foundation .] Shear Nailing J Groundwork <br /> ❑Ductwork ❑Grid ❑ Struct.Slab <br /> 0 Wocd Stove O Rough-in ❑ F' I <br /> ❑ Mas�nry 0 Service nsulation <br /> 0 Other <br /> �G:Pmt. No.�s�'J�-�-4�—0 MECH: Pmt. No.— <br /> D ELEC: Pmt. No. :J PLBG:Pmt.No. <br />