My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5507 25TH AVE W 2016-01-01 MF Import
>
Address Records
>
25TH AVE W
>
5507
>
5507 25TH AVE W 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2017 12:29:34 PM
Creation date
4/1/2017 12:29:25 PM
Metadata
Fields
Template:
Address Document
Street Name
25TH AVE W
Street Number
5507
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> r <br />, '� PUBL/C f�YO/�KS' <br /> September is, 1994 / <br /> LD & D Construction <br /> 21007 - 47th Dr SE <br /> Bothell WA 98021 <br />� RE: Owner: Beech <br /> Job Address: Lot 73 <br /> Plan Checklt B-45393 <br /> Dear Mr. Ellis: <br />� In response to your application for a construction permit, your plans have been <br /> examined and you are advised that the issuance of a permit is being withheld for the <br /> reasons listed below. These comments address building iss:,es only, additional <br /> revisions or additions may be required by other departments (such as Utilities, Planning <br />� or Fire). All references refer to the 1991 Uniform Building Code, as amended by the <br /> State of Washington and/or Washington State Energy Code 1994, 2nd Edition, unless <br /> stated othenvise. <br /> i I. Provide roof framing plan. Show all hip master and girder trosses. Show post <br />� or multiple studs under point loads from roof.. <br /> 2. Show all header sizes, species and grade. <br />� <br />` In order for the processing of your application to continue, it will be necessary to <br /> provide the Building Division with two complete new sets of drawings reflecting the <br /> conections tequesied. <br /> Upon submittal of the drawings, your applicaiion will be given priority and plan review <br /> will recommence. <br /> Sincerely, <br /> �����-�--- , <br /> Jeff Heilman <br /> Development Teclinician <br /> IH:jdlpc4.539R <br /> CITY OF EVERETT• 32J^ Cedar Street • Everett, WA 9a201• (206) 259-8802 • Fax (206) 259-8859 P.:� <br />
The URL can be used to link to this page
Your browser does not support the video tag.