Laserfiche WebLink
� INSPEICT101?� REPORT <br /> � ' <br /> Address ��a� �� �� �J <br /> Contractor ��� <br /> �C� J <br /> � Owner �c- s��� <br /> Date O- -�' <br /> �_ <br /> �APPROVAL ❑ PARTIAL APPROVAL <br /> O VIOLATION U CORRECTION REQUESTED <br /> ❑Corrections lisl�d below MUST BE MADE before work can be approved. <br /> ❑ Please contact inspector and arrange for appointment. <br /> O Was not abie to pertorm inspection. <br /> • O CALL 259-8810 FOR REINSPECTION—24 hour notice required <br /> A CERTIFICATE OF OCCUPANCY SHAII BE iSSUEO AND POSTED � <br /> ON THE PREMISES PRIOR TO OCCUPANCY. i <br /> ��, .� �- � �. <br /> Inspector ,�� Date ���� / G <br /> TYPE OF INSPECTION REOUESTED� <br /> U Temp. Elect. U Framing J Gas Piping <br /> ❑ Footing ❑ Drywal� Nailing ❑Consultation <br /> ❑ Foundation ❑Shear Nailing CI Groundwork <br /> U Ductwork O Grid ❑ Struct. Slab <br /> ❑Wood Stove �4lough•in ❑ Final <br /> ❑Masonry ❑ Service ❑ Insulation <br /> O Other <br /> 0 BLDG:Pmt. No. O MECH: Pmt No. <br /> O ELEC:Pmt. No. 3� O PLBG:Pmt. No. <br />