My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9604 25TH DR SE 2016-01-01 MF Import
>
Address Records
>
25TH DR SE
>
9604
>
9604 25TH DR SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2017 12:44:08 PM
Creation date
4/1/2017 12:44:03 PM
Metadata
Fields
Template:
Address Document
Street Name
25TH DR SE
Street Number
9604
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� PUBLIC WORKS Date o�,21,�003 � <br /> PERMIT PublicWorksPermilx pW0302-018 <br /> Building Permit k C0302-023 <br /> PUBLIC WORKS DEPARTMENT Planning Reler^nce 8 <br /> 3200 Cedar Street <br /> Everetl,WA 98201 Public Works Fee$ $z 5. 00 <br /> c4zs�z��ea��OSTING MAY 14 2004 <br /> Guarantee$ <br /> OWNERNAME LEGACY HOMES rn� irrc ANDADDRESSME <br /> ANDADDRESS: <br /> 1816 S LAK.S STEVEA'S RD <br /> LAKE STEVEIQS WA 98258 <br /> PHONE: Q,�,53340573 PHONE: <br /> TA%PARCEL�.O.N �0940700004400 PROJECTADDRESS: 9604 <br /> DESCFIPTIONOF �W HOIISE - BASIC 22�.J <br /> PROPOSED WORK: <br /> PERMIT CONDITIONS LOT 35 OF REDWOOD PARK <br /> 1. All calls for inspection shall be made 24 hours in advance-phone (425)257•8810 <br /> 2. All work shall be performed in accordance with this perrnit and current City of Everett Design and Construction <br /> Standards and Specifications. <br /> 3. Call Location Underground Service 48 hrs.befure you dig. TOLL FpEE NUMBER 1-800-424-5555 <br /> W <br /> 4 . Connect s�de sewer per City Standar3 #' s 601, 602, 604. � <br /> 5. Connect rooftop downspouts to the drainage system providEd for this �w <br /> lot. y� <br /> 6. Install erosion control measures per City of Everett Standards for <br /> small parcels m <br /> 7. Remove erosion control measures upon completion of the project prior O <br /> to final approval of tha permit. � <br /> 8 . All excavated material from foundation, sidewalk and driveways shall <br /> be hauled to an approved, permitted site. No wasting of material is Z <br /> allowed on this building lot. <br /> 9. Pave driveway from the front property line out to the street paving. O <br /> '�A <br /> . . _.. VJ <br /> �.. 0 <br /> _ �� a <br /> ACKNOWLEDGEMENi'OF CONDITIONS <br /> ��/�/� -,// / The undersigned owner/applicant hereby egrees to hold and <br /> '�/c�Z�YL !f L7/Y�� savo harmless tha Ciry of Everetl from any and ell clafms for - � � <br /> nppmvea iof consv��ion oa dama as,cosis,expenses,or causes of.action that may arise <br /> b ca e of installation and maintenance�of the improvement or <br /> ,/ ./ gh of-way use hereto applied for and fuMer ayrees to <br /> ��(�' � 1 �✓ `/'�� �L%`J r e u tic rom the Ciy antl to replace public <br /> FINAL INSPECTION ma r � , <br /> Appmved as Conslmcted Dale <br /> i <br /> S re icanl Dats <br /> WORK AUTHORIZED BV THIS PERMIT MUST BE STARTED WITHIN 1B0 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE OILIGENTLY PURSUED <br /> TO COMPLETION.THIS PERMIT MAY BE CANCELLED BY THE CIN UPON ANY STOPPAGE OF WORK ON iHIS PROJECT OVER 90 DAYS DURATION. � <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.