My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9616 25TH DR SE 2016-01-01 MF Import
>
Address Records
>
25TH DR SE
>
9616
>
9616 25TH DR SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2017 12:46:15 PM
Creation date
4/1/2017 12:46:10 PM
Metadata
Fields
Template:
Address Document
Street Name
25TH DR SE
Street Number
9616
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
( <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. As per Pubiic Works approved plan dated <br /> 5. Connect side sewer per City Standard #601. <br /> 6�Connect side sewer per City Standard #'s 601, 602, 604. <br /> 7. Connect all rooftop downspouts to the side sewer. <br /> �Connect rooftop dcwnspouts to the drainage system provided for this lot. <br /> ��J <br /> 9. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br /> Storm Manual 3-2.6.2. Width_, Depth _, Length _. <br /> 10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br /> routing pricr to beginning the project. <br /> 11 Install erosion control measures as determined by the Public Works inspector, such as silt <br /> i�nce, straw bales, swales, or erosion blankets. <br /> 12. Install erosion control measures per City of Everett Standards for smail parcels <br /> �3)Remove erosion control measures upon compietion of the project prior to final approval of the <br /> permit. <br /> �All excavated material from foundation, sidewalk and driveways shall be hauled to an <br /> approved, permitted site. No wasting of material is allowed on this building lot. <br /> 15. Remove and replace curb, gutter Znd sidewalk as per City of Everett Standard Plan #'s 305A <br /> & 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. ail unused <br /> driveways and any broken or damaged area must be replaced). <br /> 16. I��atall a Type I concrete driveway per C�t� of Everett Standard #307. <br /> 17. Pave driveway from the front property Iine out to the street paving. <br /> 18. Contact the Water District for connecting provisions for this building's <br /> water and sewer services. <br /> 19. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is II <br /> required for the parking are�. <br /> 20. If a sewer pump system is to be installed, the pressure line must discharge into a private I <br /> manhole, then gravity flow ar,ross the public right-of-way. <br /> 21. A sprinkler system is required for this building in compliance with the requirements of NFDA <br /> Standards 13D. <br /> �� ��v �-`j %/� D,e Sc I' <br /> PWCommems ' <br /> �L I <br />
The URL can be used to link to this page
Your browser does not support the video tag.