Laserfiche WebLink
( ': <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. As per Public Works approved plan dated <br /> 5. Connect side sewer per City Standard #601. <br /> � Connect side sewer per City Standard #'s 601, 602, 604. <br /> 7. Connect all rooftop downspouts to the side sewer. <br /> �, Cc�nnect rooftop downspouts to the drainage system provided for this lot. <br /> L% <br /> 9. Rcoftop runoff rnust be dischan3ed to a roof downspout infiltration system per City of Everett <br /> Storm Mani.ial 3-2.6.2. Width_, Depth _, Length_. <br /> 10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br /> routing prior to beginning the project. <br /> 11 Install erasion control measures as determined by the Public Works inspector, such as silt <br /> fence, straw bales, swales, or erosion blankets. <br /> 12. Install erosion control measures per Ciry of Even::tt Standards for small parcels <br /> 13 Remove erosion control measures upon completion of the project prior to final approval of the <br /> permit. <br /> 14 All excavated material from foundation, sidewalk and driveways shall be hauled to an <br /> approved, permitted site. No wasting of material is ailowed on this building lot. <br /> 15. Flemove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br /> & 306 on this proposal's frontage as directed by the Public Works inspector (i.e. all unused <br /> driveways and any broken or damaged area must be replaced). <br /> 16. Install a Type I concrete driveway per City of Everett Standard N307. <br /> 17. Pave driveway from the front property line out to the street paving. <br /> 18. Contact the Water District for connecting provisions for this building's <br /> water and sewer services. <br /> 19. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is <br /> required for the parking area. <br /> 20. If a sewer pump system �s ?n he ins�alled, the pressure line must discharge into a private <br /> manhole, then gravity flr,w across th� public right-of-way. <br /> 21. A sprinkler system is req�ired `or:h�:, building in compliance with the requirements of NFDA <br /> Standards 13D. <br /> �� � 2 a-s���z ��` ���� <br /> PY�Comments �'/ <br /> v <br /> � <br />