Laserfiche WebLink
' �, l <br /> PUBLIC WORKS PERMIT COMNIENTS <br /> 4. As per Public Works approved plan dated <br /> 5. Connect side sewer per City Standard #601. <br /> / 6/j Connect side sewer per City Standard #'s 601, 6G2, 604. <br /> � <br /> 7. Connect all rooftop downspouts to the side sewer. <br /> � Connect rooftop downspouts to the drainage sy�tem provided for this lot. <br /> 9. Rooftop runoff must be discharged to a roof downspout infiitration system per City of Everett <br /> Storm Manual 3-2.6.2. Width _, Depth _, Length_. <br /> 10. The contractor must meet with ihe Public Works inspector to discuss potential drainage <br /> routing prior to beginning the project. <br /> 11 Install erosion control measures as determined by the Pubiic Works inspector, such as silt <br /> fence, straw bales, swales, or erosion blankets. <br /> 12. Install erosion control measures per City of Everett Standards for small parcels <br /> 13. Remove erosion control me�sures upon completion of the project prior to final approval of the <br /> permit. <br /> //14! All excavated materia! from foundation, sidewalk and driveways shall be hauled to an <br /> Y� approved, permitted site. No wasting of material is allowed on this building lot. <br /> 15. Remove and replace curb, gutter and sidewaik as per City of Everett Standard Plan #'s 305A <br /> � 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br /> driveways and any broken or damaged area must be replaced). <br /> i 6. Install a Type I concrete driveway per City of Eve�ett Standard #307. <br /> � ave driveway from the front property line out to the street paving. <br /> 18. Contact the Water District for connecting provisions for this building's <br /> water and sewer services. <br /> 19. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is <br /> required for the parking area. <br /> 20. If a sewer pump system is to be installed, the pressure line must discharge into a private <br /> manhole, then gravity flow across the public right-of-way. <br /> 21. A sprinkler system is required for this building in compliance with the requirements of NFDA <br /> Standards 13D. <br /> PWCommenis �2 <br />