My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9901 25TH DR SE 2016-01-01 MF Import
>
Address Records
>
25TH DR SE
>
9901
>
9901 25TH DR SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2017 12:54:47 PM
Creation date
4/1/2017 12:54:35 PM
Metadata
Fields
Template:
Address Document
Street Name
25TH DR SE
Street Number
9901
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> i <br /> I <br /> I <br /> rn ,/ �G <br /> CLOSED CM WORK ORDERS REPOR'1 �OSTING �'2� ��J <br /> I Total Utility Maintenance Management System <br /> 11/28/1994 Page 1 <br /> --------------- ----------------------------------------________________________ <br /> Date Range : 11/O1/1991 - li/22/1994 <br /> CM Work Order Range :<Blank> - 8405421080001 Pattern :7401196648196 <br /> Item Range :<Slank> - WW22020ooi Pattern : * <br /> Program ALL Function ALL Activity ALL <br /> ------------------------------------------------------------- <br /> _______________ <br /> CM WORK ORDER ID: 7401196648196 Title: SO .75 TNCH 9901 25TH DR SE <br /> Item ID: -- <br /> Location ID: -- <br /> Program 740 Function 119 Activity 664 <br /> Date Completed: 11/07/1994 <br /> Overall Craft: <br /> Issued: 11/04/1994 Issued by: SKL Assigned to: <br /> Out of Service? NO Priority: Travel Time: 0. 00 Hr. <br /> Meter Reading: <br /> Downtime: 0 hours <br /> status: <br /> Labor: <br /> Craft ID Name Planned Hrs Actual Hrs Cost <br /> ----- ------ ------------------------------ ----------- ---------- ---------- <br /> UL SRJ STENSETH, ROBERT J. 0. 00 2 . 00 29. 40 <br /> WST WDT WALDEN, DAROLD T. 0. 00 2 . 00 38.88 <br /> Total Labor Cost: 68.28 <br /> Materials: <br /> ID Description Date # Used Cost <br /> ------------ ------------------------------ -------- -------- ---------- <br /> ADAP34000547 ADAPTER 3/4" MIP X INSTA-TITE@ 11/07/1994 2 15. 18 <br /> COUP34101847 COUPLING 3/4" THREADED BRASS " 11/07/1994 1 1. 06 <br /> COUP34142847 COUPLING 3/4" CTN X 3/4" MIP @ 11/07/1994 2 5.94 <br /> METE36089447 METER 5/8" * NO REMOTE READER 11/07/1994 1 26. 14 <br /> METE36089447 METER 5/8" * NO REMOTE READER 11/0?/1994 1 26. 14 <br /> PIPE34060647 PIPS 3/4." POLY I.P.S . 11/07/1994 2 0.48 <br /> SHAN34097247 SHANK 3/4" METER "BRASS" @ 11/07/1994 2 6. 16 <br /> WIRE00119847 TRACING WIRE 10 GAUGE 11/07/1994 3 0.27 <br /> Total Material Cost: 81.37 <br /> Vehicles: <br /> ID , Description Date Hours Cost <br /> ------------ ------------------------------ -------- ------ ---------- <br /> V2146 SVC TRUCK CHEV 87 11/07/1994 2. 00 10.40 <br /> Total Vehicle Cost: 10.40 <br /> Work Description: <br /> -------------------------------------------------------------------------------- <br /> METER# 39594139 <br /> Total cost for work order 7401196648196: • 160.05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.