My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1212 25TH ST 2018-01-02 MF Import
>
Address Records
>
25TH ST
>
1212
>
1212 25TH ST 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2021 9:16:12 AM
Creation date
4/1/2017 12:58:54 PM
Metadata
Fields
Template:
Address Document
Street Name
25TH ST
Street Number
1212
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLOSED CM WORK ORDERS REPORT <br />Total TJtility Maintenance Management System Page 1 <br />12/22/1997 g <br />Date Range 01/09/1989 - 12/12;1997 <br />CM Work Order Range :0810800810000 - UT2830-30-322Pattern :7101196750798 <br />Item Range :<Blank> - WVL3694L05 Pattern :* <br />Program ALL Function ALL Activity ALL <br />CM WORK ORDER ID 7101196750798 Title REPAIR 1212 25TH ST <br /><<DUPLICATE PRINTING OF THIS WORK ORDER>> <br />Item ID: WS1995QO08 -- WATER SERVICE <br />Location ID: -- <br />Program 710 Function 119 Activity 675 <br />Date Completed: 12/01/1997 <br />Overall Craft: <br />Issued: 06/25/1997 <br />Out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID Name <br />Issued by: WMW Assigned to: <br />Priority: Travel Time: 0.00 Hr. <br />----- ------ ---------- <br />UL CSG CAVAgAH, SHANE G. <br />WST WDT WALDEN, DAROLD T. <br />Materials: <br />ID <br />ADAP34000F�7 <br />BOX000065547 <br />COUP34135447 <br />ELL034101447 <br />PIPE34060647 <br />SETT34149747 <br />Vehicles: <br />ID <br />------------ <br />V2117 <br />Description <br />Planned Hrs Actual Hrs <br />0.00 4.50 <br />0.00 4.50 <br />Total Labor Cost: <br />ADAPTER 3/4" MIP X INSTA-TITE@ <br />BOX METER CONC W/STEEL LID <br />COUPLING 3/4" MIP X 1/2"CTSPJ@ <br />ELL 3/4" 90 DEG BRASS <br />PIPE 3/4" POLY I.P.S. <br />SETTER COP 5/8" X 3/4" (H711) <br />Cost <br />63.59 <br />95.54 <br />159.12 <br />Date <br /># Used <br />Cost <br />---------- <br />-------- <br />11/25/1997 <br />-------- <br />4 <br />33.52 <br />11/25/1997 <br />1 <br />46.72 <br />11/25/1997 <br />2 <br />8.08 <br />11/25/1997 <br />2 <br />2.72 <br />11/25/1997 <br />2 <br />0.38 <br />11/25/1997 <br />1 <br />38.65 <br />Total Material Cost: 130.07 <br />Description Hours <br />------------------------------ - <br />91 CHEV 1-TON HYD UNIT 4.50 <br />Total Vehicle Cost <br />Total cost for work order 7101196750798: <br />Cost <br />23.85 <br />-----23.85 <br />
The URL can be used to link to this page
Your browser does not support the video tag.