My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1303 25TH ST 2016-01-01 MF Import
>
Address Records
>
25TH ST
>
1303
>
1303 25TH ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2017 1:01:09 PM
Creation date
4/1/2017 1:00:58 PM
Metadata
Fields
Template:
Address Document
Street Name
25TH ST
Street Number
1303
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
; <br /> ��r.y y Contact Bob Landles to read or ask about the procedures for SEPA appeals. <br /> 9�3 <br /> 9 y� NOTE: This Final DNS may be uithdraWn in the event of significant changes in <br /> H �� the proposal, disclosure of new signiFicant information, <br /> y H misrepresentation by the applicant, or failure to comply with the <br /> k ��� condi�ions upon Nhich this Determination of Non-Significance is <br /> p� H� predicated. <br /> VJ H <br /> H C3 <br /> � OL�J INFORMATION FOR DE'lELOPER: <br /> H t7 <br /> OH <br /> � �g 1. Detailed dr•axings in accordance Nith City Design and Construction <br /> G�� c� Standards st;�l: be submitted to the Public Works Department shouing <br /> z H site parking layout, landscaping, utilities, storm drainage, temporary <br /> Cy x construction erosion control, and all required improvert�ents in the <br /> H H publie right-of-way. Public Works Department approval of these <br /> g y H drauings is required prior to any perm;ts being issued. All <br /> nqC�7� improvements shall be completed, approved, and Narranted before the <br /> 3t11� Occupancy Permit is issued. <br /> rn <br /> Z H[n <br /> '� �N 2, City streets and alleys are to be kept clear of dirt and debris at all <br /> times during construction. Dust suppression and street r.leaning must <br /> occur as directed by the Public Works Inspector. <br /> 3. Performance guarantees are required for the street and alley <br /> improvements, <br /> !`� � 4. A one-year guarantee is required on the public improvements for an <br /> � amount not less than 10% of the cost of construction and shall rur £or <br /> one year from che date of issuance of the first Occupancy Permit for <br /> ��,, �' tiie pro,ject. <br /> � � 5. A fire alarm will be needed if the huilding is determined to be 3 <br />, stories high. <br />� "'��► 6. GTE Northuest has facilities at this location. However, any building <br /> entrances must be coordinated at least 60 days in advance. Your <br /> (,,,, contact at GTE NorthWest is Tim Taague at 339-z036. <br /> (� �. The Parks Department recommends that some on�ite recreational am^nity <br />, be provided such as an outdoor landscaped area and a ptenic table, <br /> �. <br /> ""+�+ 8. The Police Dep�rtment has the follouing security recommendations: <br /> a. The perimeter doors should be solid core uitti 190° to 220° <br /> ,o„�� Wide angle vieuers and single cylinder deadbolts Nith one inch <br /> throu and at least 3 inch screus securing �triker plate. <br /> „ b. Sliding glass doors shnuld have Charlie Bars installed for <br /> optimum security. <br />� <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.