My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2307 25TH ST 2016-01-01 MF Import
>
Address Records
>
25TH ST
>
2307
>
2307 25TH ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2017 1:11:46 PM
Creation date
4/1/2017 1:11:40 PM
Metadata
Fields
Template:
Address Document
Street Name
25TH ST
Street Number
2307
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Activity Work Order �°���= ' <br /> eivzo�,�� i3:1� <br /> ISSUBd By WMW WARD,MICHAEL W. <br /> Issued Department Pw PUBLIC WORKS <br /> Date Issued 3�zenoos <br /> Fund aot Account s Program »o Function »y Activily sis <br /> Program <br /> TIll2 REPAIR 2307 25TH ST 710119675 <br /> Work Order No 20060837 Project Activily Type SERVICE REOUEST Slalus c� <br /> Dale 3izaizoos Time os:ao Original WO Billing <br /> VehiCle COSts <br /> Type Vehicle No Description Hours Cost Billing Date Billing Code <br /> V J0026 1997 FORD 1 TON SVC TRUCK 2 13.8 03/2912006 <br /> V J0026 1997 FORD 1 TON SVC TRUCK 2 13.8 O6/29I2006 <br /> V J0045 1999 STERLING 5 YARD DUMP 2 31.6 O6/29I2006 <br /> V F.1�043 2003 TIGER VACTOR 2 58.4 O6/29/2006 <br /> V JOD55 01 FORD 1 1/2 TON SERVICE TRUC 6 57 07I05l2006 <br /> V J00:6 1997 FORD 1 TON SVC TRUCK 6 41.4 07/05/2006 <br /> V M0009 94 ATLAS COMPCO COMP. 4 232 07/05l2006 <br /> Total Vehicle Cost 523920 <br /> Material Costs <br /> Type Mater No Description Quantiry Cost Billing Date Billing G <br /> M ADAP340003d7 ADAPTER 3l4 CST X 3/4 IPS INSTA-TITfi 1 9.595 07105/2006 <br /> M ADAPJ4000547 ADAPTER 3l4 MIP X 3/4 IPS INSTA-TITE 1 9.395 07105/2006 <br /> P,1 ELL034704247 ELBOW 3/4 NPT 90 DEG STREET CAST BRASS(1/4 BEND) 1 1.83 07105/2006 <br /> t�i PIPE34060647 PIPE 3/4 POLY IPS 52 14.196 07105/2006 <br /> Total Material Cost 535.0 <br /> NA Costs <br /> Type Na No Description Quantity Cost Billing Date Billing Code <br /> NA N/A 3!4 COPPER REPAIR CLAMP 1 7 03/28/2006 <br /> NA N/A SAND 1 9 07/05/2006 <br /> NA N/A TOPSOIL .5 7 07/05/2006 <br /> NA N/A TRACING WIRE 54 7.02 W/OSl2006 <br /> Total NA Cost 33o.oz <br /> Personnel Costs <br /> Type ID Name Hours Cost Billing Date Earning Code Class <br /> P DKR DAY, KEVIN R. 2 03/2812006 <br /> P WDL WEAVER,DEAN L. 2 03/28I2006 <br /> P DKR DAY,KEVIN R. 2 O6I2912006 <br /> P JGD JACOBS,GRFG D. 2 06I2912006 <br /> P WDL WEAVER,DEAN L. 2 O6/2912006 <br /> P KTJ KELSO,THOMAS J. 6 07/05/2006 <br /> P MJK MCKEEHAN,JACOB K. 6 07/OSI2006 <br /> P WDL WEAVER,DEAN L. 6 O7I05/2006 <br /> Total Personnel Cost <br />
The URL can be used to link to this page
Your browser does not support the video tag.