My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3612 25TH ST 2016-01-01 MF Import
>
Address Records
>
25TH ST
>
3612
>
3612 25TH ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2017 1:25:02 PM
Creation date
4/1/2017 1:24:54 PM
Metadata
Fields
Template:
Address Document
Street Name
25TH ST
Street Number
3612
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, j <br /> CIpSED CM WORK ORDERS REPORT <br /> City of Everett Total Utility Maintenance Management System <br /> 02/OB/1994 Page 1 <br /> :_�y=—�_:=�s��==-_��_�____��____:___�:__�s=s====�__�____�_====s___::__ <br /> Date Range :il/C9/1900 - O1/31/1994 <br /> CM Work Order Ranqe :0810800810001 - 8405421080229Pattern :7401196750743 <br /> Item Range :<Blank> - WW220200.1 Pattern :* <br /> Progrnm ALL Function ALL Activitp ALL <br /> (2I WORK ORDER IDva7401196750743� Titlec REPAIR 3612 25TY. � � c <br /> item ID: WS2195N05� -- WATER SERVICE <br /> Location ID: -- <br /> Program 740 Function 119 Activity 675 <br /> Date Completed: O1/2o/1994 <br /> Overall Crxft: <br /> Issued: O1/20/1994 Issued by: SKL Assiqned tu: <br /> Out of Service? NO Priotity: Travel Time: 0.00 Hr. <br /> Meter Reading: <br /> Downtime: o hours <br /> Status: <br /> Labor: <br /> Craft ID Name Planned Hrs Actual Hrs Cost <br /> --'-- '---'- --'---------"'----'---------- ----------- ---------- ---------- <br /> WST MKC MOORE, 3CIM C. 0.00 3.00 59.19 <br /> WST SRJ STENSETH, ROBERT J. 0.00 3.00 58.77 <br /> ---------- <br /> Total Iabor Cost: 117.96 <br /> Materials: <br /> ID Description Date # Used Coet <br /> -----�------ --�-------"-----�'-----'----- ----'--� -----'-- ---------- <br /> ADAP34000747 ADAPTER 3/4" RI X RI @ O1/20/1994 1 3.52 <br /> Total Material Cost: 3.52 <br /> Vehicles: <br /> ID Description Date Hours Cost <br /> -�---'------ ------------------------------ --/'-/-� ------ -----'---- <br /> V2117 CHEV 1 TON 91 O1 20 1994 3.00 17.40 <br /> Total Vehicle Cost: 17.40 <br /> Total cosl- for work order 7401196750743: 138 88 <br />
The URL can be used to link to this page
Your browser does not support the video tag.