Laserfiche WebLink
r <br /> PUBLIC WORKS PERMII" COMMEIVTS <br /> 4. As per Public WorkS approved plan dated <br /> 5. Connect side sewer per City Standard #601. <br /> �6? Connect side sewer per Ciry Standard #'s 601, 602, 604. <br /> 7. Connect aIl rooftop downspouts to the side sewer. <br /> 8 iConnect rooftop downspouts to the drainage system provided for this lot. <br /> 9. Rooftop runoff must be discharged to a roof downspo��t infiliration system Fsr City of Everett <br /> Storm Manual 3-2.6.2. Width _, Depth _, Length_ <br /> 10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br /> routing prior to baginning the project. <br /> ,/11� Install erosion control measures as determined by the Public Works inspector, such as silt <br /> � � fence, straw bales, swales, or erosion blankets. <br /> 12. Install erosion control measures per City of Everett Standards for sm�ll parcels <br /> / 13�emove erosion control measures upon completion of the project prior to final approval of the <br /> �permit. <br /> �j II excavated material from foundation, sidewaik and driveways shall be hauled to an <br /> approved, permitted site. No wasting of material is ailowed on this building lot. Y <br /> 15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A ' <br /> & 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused ; <br /> driveways and any broken or damaged area must be repiaced). � <br /> 16, Install a Type i concrete driveway per City of Everett Standard #307. ' <br /> 17. Pave driveway from the front property line out to the street paving. � <br /> 18. Contact the Water District for connectin � <br /> g provisions for this building's <br /> water and sewer services. <br /> ,. <br /> 19. A catch basin as per Ciry Standard Plan #402 with a gas trap per Standard Plan #410 is � <br /> required for the parking area. <br /> J <br /> 20. If a sewer pump system �s to be installed, the pressure line must discharge intc a private <br /> manhole, ?hen gravity flow across the public right-of-way. <br /> 21. A sprinkler system is required for this building in compliance with the requirements of NFDA <br /> Standards 13D. <br /> P1"�Cammenis �/�(� � � � � ` � ��C Z/ <br /> T"� .� Z <br /> ; <br />:....,�_, <br /> I <br />