Laserfiche WebLink
� . <br /> i <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. As per Public Works approved plan dated <br /> 5. Connect side sewer per Ciry Standard #601. <br /> �� <br /> ¢ C'6. Connect side sewer per City Standard #'s 601, 602, 604. <br /> 7. Connect all rooftop downspouts to the side sewer. <br /> S ^� Connect rooftop downspouts to the drainage system provided for this lot. <br /> � <br /> 9. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br /> Storm Manual 3-2.6.2. Width_, Depth _, Length _. , <br /> 10. The contractor must meet with the Public Works Inspector to discuss potential drainage � <br /> ^ routing prior to beginning the project. � <br /> �� 1�. Install erosion control me�sures as determined by the Public Works inspector, such as silt <br /> �'fence, straw bales, swales, or erosion biankets. <br /> 12. Install erosion control measures per City of Everett Standards for small parcels t <br /> i', <br /> � �3,%Remove erosion control measures upon completion of the project prior to final approval of the <br /> ' permit. <br /> 8 1a�, Ali excavated material from foundation, sidewalk and driveways shall be hauled to an � <br /> approved, permitted site. No wasting of material is allowed on this building lot. <br /> 15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br /> & 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br /> driveways and any broken or damaged area must be replaced). i <br /> 16. Install a Type I concrete driveway per City of Everett Standard #307. <br /> 17. Pave driveway from the front property Iine out to the street paving. <br /> 18. Contact the Water District for connecting provisions for chis building's <br /> water and sewer services. <br /> 19. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is <br /> required for the parking area. <br /> 20. If a sewer pump system is to be instalied, the pressure line must discharge into a private <br /> manhole, then gravity flow across the pu�iic right-of-way. <br /> 21. A sprinkler system is required for this building in compliance with the requirements of NFDA <br /> Standards 13D. <br /> � � , <br /> t % ) S�'.:: Cc.�r �ccn v-n��� <br /> �1 �� �,. / � o� l� r�i ��� s� <br /> PVlCamments <br /> Z/ <br />