Laserfiche WebLink
c � c; <br /> Aveci�- wo� <br /> February 23, 2000 <br /> Town&. Country Post Frame Buildings <br /> 16521 Highway 99 <br /> Lynwood, WA 98037 <br /> RE: Owner: Canyon Lumber <br /> Job Address: 3821 - 26'" Place <br /> Plan Check No: B9912-048 <br /> In response to your application for a construction pernut, your plans have been examined and you are <br /> advised that the issuance of a permit is being withheld for the reasons tisted 6elow. 1'hese comments <br /> address building issues only, additional revisions or additions may be required by other departments <br /> (such as Utilities, Planning or Fire). All references refer to the 1997 Uniform Building Code, as <br /> amended by the State of Washington and/or Washington State Energy Code 1997 Editior�, unless <br /> stated otherwise. <br /> In order for the processing of your application to continue, it will be necessary to provide t6e <br /> Building Divisioa with two complete new sets of drawings ref]ecting the corrections requested. <br /> 1. Item #1 of the letter sent to you January 11'" has yet to be addressed. It reads as <br /> follows; 1'he west wall is shown at 3 feet from the property line on the site plan. Per <br /> Table 5-A, that wall should be protected by a mmimum af one-hour fire-resistive <br /> construction. Details and a fire resistive listing should be provided. UBC Section <br /> 503.2 <br /> 2. The latest revision to the structural analysis of the 6 X 8 posts appeazs to be <br /> . incomplete. As discussed previously, two walls cannot provide a sheaz wall lateral- <br /> force-resisting-system. Therefore the posu must be designed to carry all of the wind <br /> load. If the sidewall posts are considered laterally supported at both the top and the <br /> bottom (as indicated in the analysis), then the roof diaphragm is required to carry the <br /> upper sidewall post reactions to the end walls. Therefore the end wall posts must be <br /> analyzed as cantilevered from the bottom with the diaphragm force applied to the top. <br /> This amounts to a large overstress in the end-wall columns. <br /> Upon resubmittal of the drawings, your application will be given priority and plan review will <br /> recommence. <br /> Atl required submittals shall be of sufficient detail and contain sufficient information to ensure that th` <br /> proposed structure will be constructed in compliance with all adopted codes. <br /> Sincerely, <br /> 1 � ,,y�._ <br /> v � <br /> Steve Miller <br /> IAssociate Engineer <br /> cc: Doug Schwind <br /> DEDVPLHCK\ISTRW ILLER\ <br /> CITY OF EVERETT•3200 Cedar Street � Everett,WA 98201 • (425) 257-8800•Fex(425) 257-8856 <br />� _ _ ___� — -- _ --- - — <br />