Laserfiche WebLink
JUL-26-2902 13:18 CHNYON LUMBER C0. 425 259 6322 P.01i01 <br /> Canyon L�mbe� Co., Inc. <br /> 3821 26TM Place•EvwatT,WA 08201 <br /> Buskiecs Offica Til�phon�(42b)259-0808•Fax(426)259-6322 <br /> www.ariyan-lumb�r.com <br /> July 25,2002 <br /> Mazgarct McLeod <br /> Building Division <br /> City of Everett <br /> 3200 Cedar Street <br /> Evereft, Wa 98201 <br /> Re: Job Address: 382126'�Pl <br /> Permits: M0002-025 (Gas Pipit►g)—Signed offlApproved 2/23/02 by "BW' <br /> B9911-015 (New Boiler Building) <br /> B99]1-016 (New Dry Kiln) <br /> Dear Madam: <br /> ln response to your Iciter Dated July 15,2002 F,egarding Expiring Pen:�its. <br /> Canyon Lumber Co., Inc. requests a]80 day extension for the New Boiler Building <br /> Permit as well as the New Dry Kiln.The Gas Piping permit was approved and signed off <br /> by your inspectot whose signature looks like"B W'. <br /> Thank you for your attention to this matter. <br /> Sincerely, <br /> Canyon Lumber Co., Inc. <br /> ..�a....� `�C �a..4.t$�— <br /> Dazrel Pederson ' <br /> General Manager <br /> DP/tj <br /> � <br /> I <br /> TOTRL P.01 <br />