My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1925 26TH ST 2016-01-01 MF Import
>
Address Records
>
26TH ST
>
1925
>
1925 26TH ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2017 1:50:04 PM
Creation date
4/1/2017 1:50:02 PM
Metadata
Fields
Template:
Address Document
Street Name
26TH ST
Street Number
1925
Notes
BACKWATER VALVE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
% <br /> , <br /> :� <br /> �- P[!BL/C M/O?K5 I <br /> ��: <br /> May 2, 2019 <br /> Chuck Morrison <br /> 1925 26`" Street <br /> Everett, VJA 98201 <br /> Re: Backwater Valve Installation at 1925 26`" SVeet <br /> Dear h1r. Morrison: <br /> As you are aware, th� uty's conhactor, Steve's Plumbing, inspected your plumbing and drainage <br /> facilities to determine if a backwater valve is app�opriate for your propeRy.Their findings indicate <br /> that inst�iling a bzckv�ater valve on your property would be beneficial. Please review the <br /> endosed report. <br /> Previously, you signed the Backr:ater Valve Authorization Form authorizing the City to install a <br /> backwater valve at your prop�rty. Based on the inspection report, we are praeeding with the <br /> installation. TFe Cit}Lcontractor Combined Construction will be contactingyou in <br /> Mav to schedule the work. This �v;ll require entry into the building at the above address. <br /> The Ciry will provide you on-site training on the operation and maintenance of the bac:kwater <br /> valve. Maintenance of the valve and the plumbing, setiver, and drainage on your property are <br /> your responsibility. The inspedion identified additional site drainage and plumbing deficiencies in <br /> your private drainaye and plumbing system. 7hese include: <br /> • Debris clogging the exterior cleanout on east side needs to be removed and should be <br /> monitoreci. <br /> • A portion of your side sewer needs to be replaced (see N report). <br /> These deficiencies are your responsibility to address, as you desire. The City is not responsible <br /> for future sewer or storm damages that may result fiom improper maintenance of, or deficiencies <br /> within, your private plumbing and drainage syslem. <br /> If you have any questions about this process, please contact Grent hloen at 425-257-4947 or <br /> gmoen@2verethva.gov, or �rian Doolan at 425-257-8826 or bd_oolan a evcrethva.aov. Thank you <br /> for your int�rest in our backwa[er valve program. <br /> Sinccrcly, <br /> l ) , _ I <br /> l" ' <br /> � <br /> hlark Sadler ; <br /> Maintenance Superintendent I <br /> Everett Public Works <br /> ! <br /> I <br /> I <br /> � <br /> CITY OF EVERETT • 3200 Cedar Sireet • Everett,WA�J8201 • (425) 257-8800 • Fax (425) 257-8882 � <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.