Laserfiche WebLink
� � <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. Connect side sewer per City Standard #601. <br /> 5. Connect side sewer per City Standard #'s 601, 602, 604. <br /> � Connect all rooftop downspouts to the side sewer. <br /> 7. Connect rooftop downspouts to the drainage system provided for this lot. <br /> 8. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett Storm <br /> Manual 3-2.6.2. The approximate size trench is 3.5' wide, 2'deep and 25' long. See attachment for <br /> more details. <br /> / 9. / The contractor must meet with the Public Works Inspector to discuss potential drainage routing prior to <br /> L� beginninc� the project. <br /> 10 Install erosion control measures as determined by the Public Works inspector, such as silt fence, straw <br /> bales, swales, or erosion blankets. <br /> 11. Install erosion conlrol measures per City of Everett Slandards for small parcels <br /> 12. Remove erosion conirol measures upon comple�ion of ihe project prior to finzl approval of the permit. <br /> 13 All excavated material from foundalion, sidewalk and driveways shall be hauled to an approved, <br /> permilled site. No wasling of material is allowed on lhis building lot. <br /> � <br /> 14. ' No dirt, mud, rocks or debris to be lracked onto roadway. <br /> 15. No building materials lo be stacked on sidewalks and sidewalks to be kept clean and open for <br /> pedesirian travel. <br /> 16. Adjust waler meter box 1"above sidewalk grade. <br /> 17. Remove and replace curb, gutter and sidewalk as per Cily o(Everett Standard Plan #'s 305A& 306 on <br /> this proposal's (rontage as direcled by the Public Works Inspector(i.e. all unused driveways and any <br /> broken or damaged area musl be replaced). <br /> 18. Install a Type I concrel� driveway per City of Everetl Standard#307. <br /> 19. Pave driveway from the froM property line out to the street paving. <br /> 20. Contact the Water District for connecting provisions for lhis building's water and <br /> sewer services. <br /> 21. A catch basin as per Ciry Slandard Plan #402 with a gas irap per Standard Plan #410 is required for Ihe <br /> parking area. <br /> 22. If a sewer pump system is to be installed, �he pressure line must discharge into a private manhole, then <br /> c�raviry flow across ihe public right-of-way. <br /> 23. A sprinkler system is required for tliis building in compliance witfi the requiremenis of NFDA Standards <br /> 13D. <br /> PWCommenls � �n./1 <br /> l. <br />