Laserfiche WebLink
PUBLIC WORKS PERMIT COMMENTS <br />4. As per Public Works approved plan dated _ <br />5. Connect side sewer per City Standard #EC �. <br />,� ` 6 Connect side s�wer per City Standard #'s 601, 602, 604. <br />'. Connect all rooftop downspouts to the side sewer. <br />r��Connect rooftop downspo �ts to the drainage system provided for this lot. <br />t <br />Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br />Storm Manual 3-2.6.2. Width _, Depth _, Length _. <br />10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br />�fouting prior to beginning the project. <br />(,� �1 Install erosion control measures as determined by the Public Works inspector, suoh as silt <br />�� fence, straw bales, swales, or erosion blankets. <br />12. Install erosion control measures per City of Everett Standards for small parcels <br />�� 13 Remove erosion control measures upon completion of the project prior to final approval of the <br />permit. <br />� 14., All excavated material from foundation, sidewalk and driveways shall be hauied to Sn <br />-- approved, permitted site. No wasting of material is allowed on this building lot. <br />15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br />& 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br />driveways and any broken or damaged area must be replaced). <br />16. Install a Type I concrete driveway per City of Everett Standard #307. <br />17. Pave driveway from the front property line out to the street paving. <br />18. Contact the Water District for connecting provisions for this building's <br />water and sewer services. <br />19. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan n410 is <br />required for the parking area. <br />20. If a sewer pump system is to be instalied, the pressure line must discharge into a private <br />manhole, then gravity flow across the public right-of-way. <br />�, 1 A sprinkler system is required for this building in compliance with the r�quirements of NFDA <br />"1 Standards 13D. <br />PWComments <br />�/Z <br />