Laserfiche WebLink
July 1, 1980 <br />Snohomish County P.U.D. <br />P. O. Box 1107 <br />Everett, WA 98206 <br />ATTN: Mr. R. S. Billings <br />Subject: P.U.D. Permit /� 80-13 <br />W.O. �l 091021 <br />Dear Mr. Billings: <br />the Evergreen <br />CITY OF <br />everett <br />CITY M�LL � 3l�ti1!! <br />cvcn[tr. w�swinaroH <br />�uo� <br />Your application for a perrnit to install an underground power system within <br />the public right-of-way at 5033 27th Ave. W has been approved on July 1, 1980 <br />as per plans. <br />The subject permit approval is based on the agreement that all work will be <br />carried out in accordance with the City of Evere:t standards and American <br />Public Works Association specifications for trench excavation and backfilling <br />(Reference: Section 61, par. 3.05 and 3.d6). All hard surface street crossings <br />shall he by jacking, boring or other preapproved construction methods. <br />It will be the obiigation of the utility company to bear any costs that may be <br />incurred intesting and confirming the requirement. <br />The restoration <br />condition and <br />representative. <br />of all landscaping and repairs will be comparable with its original <br />to the satisfaction of the City Engineer or his appointed <br />It will be your responsibility to contact the City Engineering Department (phone <br />259-8811)immediately prior to starting construction. <br />Sincerely, <br />HUGH WP.P.REN, P.E. <br />nirector of Public Works <br />�/��`-- - — <br />By: Jeff Kerwin <br />Utility Inspector <br />HW:�K:jcl <br />