My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2725 32ND AVE NE 2018-01-02 MF Import
>
Address Records
>
32ND AVE NE
>
2725
>
2725 32ND AVE NE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2021 1:33:59 PM
Creation date
4/1/2017 2:46:40 PM
Metadata
Fields
Template:
Address Document
Street Name
32ND AVE NE
Street Number
2725
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIELD REPORT <br />Associated Earth Sciences, Inc. <br />911 Fifth Avenue <br />Kirkland, Washington 98033 <br />425.827-7701 FAX 827.5424 <br />TO: <br />Pacific Topsoils Inc _ <br />805 801h Street SW <br />Everett, WA 98203 <br />ATTN: Janusz Ralsarnnicz <br />AS REQUESTED BY Client <br />THE FOLLOWING WAS NOTED: <br />Page I of 2 <br />❑ate <br />1'ra)ect Name �- JII <br />Project No. <br />7l26/11 <br />Smith Island �IC'd 0?4 <br />KE090169B ph <br />Location <br />Weather <br />Smith Island <br />Cloudv 60's <br />Municipality <br />Report Number, <br />Snohomish County <br />46 <br />Engineer/Architect <br />,a <br />Parametrix <br />Cllent/Onner <br />Pacific Tops ils Inc <br />General Contractor/Superintendent <br />Pacific Topsoils inc/Thomas <br />Grading Contractor/Superintendent <br />Pacific Topsoils Inc/Thomas and Roger <br />AESI on site part time, as requested by the client, to monitor construction progress of Pacific Topsoil's "Smith Island" project. <br />Mass Gradloe burr -¢v.a. <br />Trending generally west to east, the earthwork contractor continued mass grading processes focske opmW sludge disposal area near <br />the south end of Pacific Topsoil's Smith Island Facility. Utilizing a large dozer (D6), the contractor spread recently placed/stockpiled/aerated <br />imported soils from the Highway 9 widening site (bluish gray SILT to brownish gray silty SAND with few gravels) into an approximately .5-I' <br />loose lift and compacted the material via large vibratory roller. The compacted material was observed to be unyielding under the continued <br />wheel weight of truck/trailer assemblies. Further, the compacted soil was probed, with the full weight of the observer on a .5" diameter steel <br />T-probe, and proved fimJunyielding with average penetrations of I". A series of in place density tests were conducted to confirm the specified <br />minimum compaction (95% ASTM 1557). The contractor was notified of all density results listed below. The contractor noted that some areas <br />of stockpiled fill near the southwest end of the proposed disposal area appeared ss;l upon import. These areas, the contractor noted, would be <br />spread and further aerated to at/near optimum moisture condition before being compacted. See figure I for specific task location. <br />Density Results <br />Test # <br />Location <br />Depth It below finish <br />% Moist <br />Dy D <br />I Max D D <br />% Max <br />P/F <br />t1 <br />See figure 1 <br />-1 <br />7.3 <br />135.2 <br />1 141.0 <br />96 <br />P <br />t2 <br />See figure 1 <br />-1 <br />7.1 <br />135.5 <br />141.0 <br />96 <br />P <br />t3 <br />See figure 1 <br />-1 <br />6.8 <br />134.6 <br />141.0 <br />95 <br />P <br />!4 <br />See fi ure 1 <br />-1 <br />6.9 <br />136 <br />141.0 <br />96 <br />P <br />t5 <br />See figure 1 <br />-1 <br />7.5 <br />134.3 <br />141.0 <br />95 <br />P <br />t6 <br />See figure 1 <br />-1 <br />7.7 <br />134.1 <br />141.0 <br />95 <br />P <br />t7_ <br />See figure 1 <br />-1 <br />7 <br />135.1 <br />141.0 <br />96 <br />P <br />t8 <br />See figure 1 <br />-1 <br />6.8 <br />135.8 <br />141.0 <br />96 <br />P <br />t9 <br />See figure 1 <br />-1 <br />7.4 <br />134.3 <br />141.0 <br />95 <br />P <br />doSee <br />figure 1 <br />-1 <br />7.6 <br />1 133.8 <br />141.0 <br />95 <br />P <br />COPIES TO: Distribution FIELD REP.: <br />DATE AUG 0 5 2011 PRINCIPAL/PM: <br />MAILED: <br />Jon D. Hansen, Sr Staff Geologist <br />Jon Sondergaard, P.E.G <br />
The URL can be used to link to this page
Your browser does not support the video tag.