Laserfiche WebLink
FIELD REPORT <br />Associated Earth Sciences, Inc. <br />�. J4 <br />911 Fifth Avenue <br />Kirkland, Washington 98033 <br />425-827-7701 FAX 827-5424 <br />TO: <br />Pacific Topsails Inc <br />805 80" Street SW <br />Everett WA 98203 <br />ATTN: Janusz Raisarowicz <br />AS REQUESTED BY Client <br />THE FOLLOWING WAS NOTED: <br />Page I of 2 <br />Date <br />Project Name <br />Project No. <br />8116111 <br />ISmith Island 10-Acre <br />KE090169B <br />Location <br />y milder <br />Smith Island <br />Sunny 70's <br />llfunicipality <br />Report Number <br />Snohomish County <br />56 <br />Engineer/Architect <br />Parametrix <br />Client/Owner <br />Pacific )'o oils Inc <br />Cencrnl Contractor/Superintendent <br />Grading Topsails IndThomtu <br />Grading Contractor/Superintendent <br />Pacifie'rcpsoils Incl"omas and Roger <br />AESI on sift part time, as requested by the client, to monitor construction progress of Pacific Topsoil's "Smith Island" project. <br />Mass Grading <br />Trending generally cast to west, the earthwork contractor continued mass grading processes over the project's former sludge disposal area near <br />the south end of Pacific Topsoil's Smith Island Facility. Utilizing a large dozer'D6), the contractor spread recently stockpiled imporred soils <br />from the I lighway 9 widening site (bluish gray SILT to brownish gray silty SAND with few gravels) into an approximately .5-l' loose lift. <br />During time of visit no compaction processes were observed. The contractor noted that the other crew member, whom typically ran to roller, was <br />not here today "nd requests AESI return in a few days to complete testing of the observed fill. Further, the contractor noted that he would <br />continue stockpiling and aerating import material from the Mercer Island site as it continual to appear wet. The contractor's supaintendent, <br />Thomas, noted that they would begin hauling crushed rock for use in the specified biotic layer in the coming weeks. AESI will collect a sample <br />of the material prior to placement. Sec figure I for specific task location. <br />COPIES TO: Distribution <br />FIELD REP.: Jon D. Hansen, Sr Staff Geologist <br />DATE AUG PRINCIPAL / PM: Jon Soudergaard, P.E.G . <br />MAILED: 2 2Q11 <br />