My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2725 32ND AVE NE 2018-01-02 MF Import
>
Address Records
>
32ND AVE NE
>
2725
>
2725 32ND AVE NE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2021 1:33:59 PM
Creation date
4/1/2017 2:46:40 PM
Metadata
Fields
Template:
Address Document
Street Name
32ND AVE NE
Street Number
2725
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'1 <br />WEYERHAE SEER SMITH ISLAND LANDFIL <br />CLOSURE IMPROVEMENTS AND MES OUTFALL 006 aNMUiION <br />SEPA ENVIRONMENTAL CHECKLET <br />a. Would the project result in an increased need for public services (for example: fire <br />protection, police protection, health care, schools, other)? If so, generally describe. <br />Since no change is Proposed in the use of the site, it is assumed that site protection is within <br />the existing capabilities of local fire and police departments. <br />b. Proposed Treasures to reduce or control direct impacts on public services, if any. <br />Not applicable. <br />16. Utilities <br />a. Check utilities currently available at the site: <br />x electricity: Snohomish County PUD <br />natural gas: <br />_water: <br />refuse service: <br />x telephone: Verizon <br />_sanitary sewer: <br />_ septic system <br />other <br />b. Describe the utilities that are proposed for the project, the utility providing the service, and <br />the general construction activities on the site or in the immediate vicinity which might be <br />needed. <br />No impacts on existing local utility services will result from implementation of this project. <br />Power conductors will be routed underground to the lift station for intermittent operation <br />of transfer pumps and control systems. Plans are to also extend a telephone line <br />underground to the lift station to provide for remote monitoring of pond and ditch water <br />levels. The utility providers are listed above. The conductors will be extended from existing <br />over -head lines along the Miller Shingle access road to the south. Both the power and <br />telephone conductors will be routed in separate conduits in a common trench along the <br />edge of the berm road. <br />23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.