My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2725 32ND AVE NE 2018-01-02 MF Import
>
Address Records
>
32ND AVE NE
>
2725
>
2725 32ND AVE NE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2021 1:33:59 PM
Creation date
4/1/2017 2:46:40 PM
Metadata
Fields
Template:
Address Document
Street Name
32ND AVE NE
Street Number
2725
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INFORMATION FOR DEVELOPER: <br />The following information is provided for the developer's benefit. These are not SEPA conditions but are <br />associated with other laws or requirements. All requirements are preliminary in nature, and are based <br />upon the preliminary site plan and the ordinances in effect at time of submittal for SEPA review. The <br />proposal must comply with all ordinances in effect at the time a complete building permit application <br />is filed, including those not specifically set forth herein. (Exception: For vesting under the Zoning <br />Code, please refer to Section 44 of the Zoning Code). Contact the Planning Department for information <br />regarding appeals processes for the requirements listed in this document. <br />1. A Public Works Fill Permit is required for this project. Detailed drawings in accordance with City <br />Design and Construction Standards shall be submitted to the Public Works Department, showing utilities, <br />storm drainage, temporary construction erosion control, and all required improvements. Public Works <br />Department approval of these drawings is rcquired.prior to any permits being issued. <br />2. Lack of comment on the plans submitted with the application does not constitute approval of these plans. <br />3. City streets and alleys are to be kept clear of dirt and debris at all times during construction. Dust <br />suppression and street cleaning must occur as directed by the PC.—'ic Works Inspector. <br />4. Comply with SMA#04-004. <br />
The URL can be used to link to this page
Your browser does not support the video tag.