My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2725 32ND AVE NE 2018-01-02 MF Import
>
Address Records
>
32ND AVE NE
>
2725
>
2725 32ND AVE NE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2021 1:33:59 PM
Creation date
4/1/2017 2:46:40 PM
Metadata
Fields
Template:
Address Document
Street Name
32ND AVE NE
Street Number
2725
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE B: SNM .oLAND LANDFILL 177065B <br />PHASE 2 CLOSURE IMPROVEMENTS <br />allowed. HDPE welding shall be by qualified and approved welders as <br />identified in Section 02632, Storm Drain Piping. <br />D. Install piping, appurtenances, and pipe hangers and supports in accordance <br />with Section 02632, Storm Drain Piping. <br />E. Install access cover in accordance with Drawings. <br />3.2 LEAKAGE TESTING <br />A. After all HDPE manhole pipe stubout connections have been completed for <br />the HDPE manholes, and prior to backfilling, perform leakage tests for the <br />manholes. Each manhole shall be completely filed with water and no leaking <br />shall be allowed from any HDPE joints for a period of 8 hours. Contractor <br />shall provide necessary shoring during leaka, ,e. testing of manhole per <br />manufacturer's recommendations to compensate for lack of backfill. <br />SEA/177065.A7.19 <br />02633 <br />END OF SECTION <br />JULY 16, 2004 <br />HIGH DENSITY POLYETHYLENE <br />
The URL can be used to link to this page
Your browser does not support the video tag.