My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2725 32ND AVE NE 2018-01-02 MF Import
>
Address Records
>
32ND AVE NE
>
2725
>
2725 32ND AVE NE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2021 1:33:59 PM
Creation date
4/1/2017 2:46:40 PM
Metadata
Fields
Template:
Address Document
Street Name
32ND AVE NE
Street Number
2725
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
--4Z4 <br />Associated Earth Sciences, Inc. <br />M 0 NJ W1 0 <br />eegra6nq aer25Van ofService <br />January 25, 2011 <br />Project No. KE050286A <br />Pacific Topsoils, Inc. <br />805 80' Street SW <br />Everett, Washington 98203 <br />Attention: Janusz Bajsarowicz <br />Subject: Final Geoteclutical Letter <br />Grading Permit No. 08-107674 CG <br />Smith Island 30-Acre Landoll <br />Snohomish County, Washington <br />Dear Mr. Bajsarowicz: <br />As requested, Associated Earth Sciences, Inc. (AESI) is pleased to provide this final letter <br />regarding our geotechnical construction monitoring observations performed at the above - <br />referenced site. AESI performed periodic site visits from April 3, 2006 through January 13, <br />2011 to obtain samples of borrow source soils for testing and to observe site earthwork <br />activities involving placement and compaction of the compacted soil layer and soil cover. 'Pile <br />results of our observations are summarized in our Field Report Nos. 1 through 222 kept on file <br />in our Kirkland, Washington office. <br />Testing and approval of borrow source soils and testing of the compacted soil layer were <br />performed in general accordance with Appendix C of the Srnirh Island landfill Final Phase 3 <br />Closure h»oroventenrs Engineering Repori, dated March 2007, prepared by Parametrix. Based <br />on our observations, in our opinion, the project earthwork we observed has been completed in <br />general accordance with the above -referenced report and approved project plans. The as -built <br />survey of the final soil cover performed by Concept Engineering, dated January 4, 2011, is <br />attached to this letter. <br />Kirkland Everett Tacoma <br />425-827-7701 425-259-0522 253-722-2992 <br />www.aesgeo.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.