My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2725 32ND AVE NE 2018-01-02 MF Import
>
Address Records
>
32ND AVE NE
>
2725
>
2725 32ND AVE NE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2021 1:33:59 PM
Creation date
4/1/2017 2:46:40 PM
Metadata
Fields
Template:
Address Document
Street Name
32ND AVE NE
Street Number
2725
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIELD REPORT <br />Associated Earth <br />th Sciences, IncI <br />0 3'�I M <br />911 Filth Avenue. Suite 100 <br />Kirkland. Washington 98033 <br />425.827-7701 FAX 827.5424 <br />TO <br />Pacific Topsoil, Inc. <br />805 80" Street SW <br />Everett WA 98203 <br />Al IN. Januz Buiarowia <br />AS REQUEST ED BY <br />THE FOLLOWING WAS NOTED: <br />Pa -Iof2 <br />Date <br />Project Name <br />Project Nn <br />Smith Island Dredge Disposal <br />521/10 <br />it_ <br />KE090169B_ <br />_ <br />l.ucatiun <br />Weuthcr <br />Partly sunny, <br />Smith Island <br />50's <br />Municipaiily <br />Report Numbn <br />Snohomish Count <br />2 <br />EngineedAahitecl <br />]Into matrix <br />Clienl/Owna <br />Pacific To soil's, Inc. <br />Genctat Contracturl, perimcndcni <br />PACIBc To sail's, Inc. <br />Grading Contractor/Superintendent <br />Pacific Topsoil's, Inc. <br />AESI on site at the client's request to observe carthw'ork activities for the Smith Island dredge disposal site cap. Upon arrival we <br />observed the following: <br />We observed the contractor continuing to strip the area of vegetation and trees. The material was stockpiled at several locations <br />on the site. The contractor continued to excavate and spread the center berm soils along the west end of the site. The berm fill <br />consisted of silty fine sands with little gravel. See site plan for approximate locations. <br />The contractor continued to allow the area to the far west to dry due to the softer nature of the subgrade in this area. The <br />contractor continued to stockpile gravelly sandy soils at the eastern end of the site. <br />AESI will return to observe ongoing construction activity as needed. <br />COPIES TO. <br />DA I"F. <br />MAILED: <br />Mailing 1,151 <br />JUN (1 9 2010 <br />1'1f:L1/ I�LI <br />PRINCIPAL / PM: Jon Sondergaard, P F. G <br />
The URL can be used to link to this page
Your browser does not support the video tag.