Laserfiche WebLink
_ --___e_r_._., � <br />, L� <br />CIASED CM WORK ORDERS REPORT <br />�Total Utility Maintenance Management System <br />________12/05/1994 Page 1 <br />________________________________________________________________________________ <br />��ce Range :11/O1/1991 - 11/30/1994 <br />CM Work Order Range :<Blank> - 8405421080001 Pattern :7101196770018 <br />Item Range :c$lank> - WW22020001 Pattern :* <br />Program ALL Function ALL Activity ALL <br />__________________________________________________________________________=_-___ <br />CM WORK ORDER .T.D: 7102196770a18 Title: INSTALL 84C3-32ND AVE SE <br />«DUPLICATE PRINTING OF THIS WORK ORDER» <br />Item ID: WML1785B01 -- WATER MAIN LINE <br />Location ID: -- <br />Program 710 Function ,119 Activity 677 <br />Date Completed: 11/29/1494 <br />Overall Craft: <br />Issued: 11/22/1994 <br />out of Service? NO <br />Meter Reading: <br />nowntime: 0 hou;s <br />Status: <br />Labor: <br />Craft ID <br />UL BBA <br />EO CCL <br />WFI,D DGL <br />UL DMJ <br />SUP2 GJ <br />HEO WMF <br />SUP1 y7MW <br />Materials: <br />ID <br />HYDR44135347 <br />LUG034012153 <br />N/A <br />N/A <br />Vehicles: <br />IB <br />V2137 <br />V2156 <br />VJ0001 <br />Issued by: GJ Assigned to: <br />Priority: Travel Time: 0.00 Hr. <br />Nafie <br />BRADLEY, BROGK A. <br />CRAIG� CHES'I`ER L. <br />DISETH, GARALD L. <br />DOUCETTE, MARK J <br />GARZA, JOHN (NEd2) <br />WELLMAN, MARK F. <br />WARD, MICHAE;L W. <br />Description <br />--------^---------- <br />HYDRANT 6' BURY M�T <br />DUC LUG 3/4" @ <br />6�' FOLLOWING RIN�(FROM STOCK) <br />6" MJ KIT (FROM STOCK) <br />Planned HrQ <br />0,00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />O.QO <br />0.00 <br />Actual Hrs <br />2.OG <br />2.00 <br />2.00 <br />2.00 <br />2.00 <br />2.00 <br />2.00 <br />Total Labor Cost <br />Date # Used <br />11/29/1994 1 <br />11/29/1�94 2 <br />11/29/1994 1 <br />11/2S/1994 1 <br />Total Material Cost: <br />Description Date Hours <br />------------------------------ -------- ------ <br />BOOM TRUCK(5 TON CRANE) GMC 84 11/28/1994 2.00 <br />SVC TRUCK DODGE 89 11/28!1994 2.00 <br />92 CHEV 1 TON 4X4 11/28/1994 2.00 <br />Tota1 Vehicle Cost: <br />Total cost for work order 7101196770018: <br />Cost <br />31.65 <br />36.18 <br />43.44 <br />27.34 <br />47.73 <br />37.32 <br />41.38 <br />265.10 <br />Cost <br />725.. 231 <br />3.� <br />e� 2.00 � <br />u�--- ZZ-�-/ <br />' y 9. S <br />Cost <br />22.80 <br />10.80 <br />13.40 <br />47.00 <br />1085.25 <br />