Laserfiche WebLink
3 <br />CLOSED Cbi 1POR1C ORD8R8 R=PORT <br />' Total Utility Maintenance Management Syetem <br />11/10/1998 Page.l <br />e=oc'eooaeaaaSvm:avee�avass�aa=v=msz�mae�seasa�asevxavvenavoeasc'as=ex�aae=vccss <br />Date Range :06/24/1900 - 11/10/1998 <br />CM Work Order Range :0810800810001 - UT2883- - Pattern :71C1096740058 <br />Item Range :<Blank� - WVL3694L05 Pattern :* <br />Program ALL Function ALL Activity ALL <br />ee_ecovve3aass��xe-vxsasaaseaasa�aaaaasasavaz�v=veveaae�aeee�avo�oeoae=�c_='axev <br />CM WORK ORDER ID: 7101096740058 Title: REPAIR 1111 32ND ST <br />«DUPLICATE PRINTING OF THIS WORK ORDER» <br />Item ID: SML3095G05 -- SEWER MAIN <br />Location ID: -- <br />Program 710 �'unction 109 Activity 674 <br />Date Completeda l0/20/1998 <br />Overall Craft: <br />Issued: 10/16/1998 <br />Out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID <br />SUP1 AGA <br />DLI KJ <br />HEO MCC <br />EO MJL2 <br />UL PWR <br />Material8: <br />ID <br />BRIC00061156 <br />CEME00061438 <br />Vehiclea: <br />ID <br />V0058 <br />V2111 <br />V2152 <br />V2230 <br />V3603 <br />V6807 <br />issued by: AGA Aaeigned to: <br />Priarity: Travel Time: 0.00 Hr. <br />Name <br />------------------------------ <br />AHLES, GREGORY A. <br />KENNEDY, JASON <br />MAGEE, CARL C. <br />MITCHELL, JEFFREY L. <br />PZJGSLEY, WILLIAM R. <br />Planned Hra <br />0.00 <br />U.00 <br />0.00 <br />0.00 <br />0.00 <br />Actual Hrs <br />2.00 <br />8.00 <br />8.00 <br />8.00 <br />8.00 <br />Total Labor Coat: <br />Description Date # Uaed <br />------------------------------ -------- -------- <br />SRICK CONCRETE 2" X 4" X 8" 10/20f1998 20 <br />CEMENT 20 MIN. SET 50 LB. BAG 10/20/1998 2 <br />Description <br />------------------------------ <br />'98 CHEV 1/2 T 4X4 PU <br />92 CHEV 1-TON <br />87 DODGE W/HOIST <br />91 FORD F800 DUMP 5 YARD <br />86 CASE BACKHOE 780 <br />89 COMPRESSOR IR <br />Total Material Cast: <br />Hours <br />2.00 <br />8.00 <br />8.00 <br />8.00 <br />8.00 <br />8.00 <br />Total Vehicle Cost: <br />Coat <br />11.80 <br />41.60 <br />38.40 <br />8.00 <br />311.20 <br />38.40 <br />449.40 <br />Coat <br />46.32 <br />72.00 <br />169.60 <br />160.72 <br />105.36 <br />554.00 <br />Cost <br />5.40 <br />23.68 <br />29.08 <br />Work Description: <br />-------------------------------------------------------------------------------- <br />REPAIR CAVE IN OVER MAIN. DUG UP SINK HOLE AtiOUND MANHOLE. THIS ADDRESS NO <br />