My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1820 32ND ST 2018-01-02 MF Import
>
Address Records
>
32ND ST
>
1820
>
1820 32ND ST 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2021 2:00:40 PM
Creation date
4/1/2017 2:55:41 PM
Metadata
Fields
Template:
Address Document
Street Name
32ND ST
Street Number
1820
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PEIMIIT5:oo Date: <br />City of Everett f3uAc Works 95itment 037ftblic Works Permit #: <br />3200 Cedar Street CT 1 Building Permit #; <br />EverR£MAIGO- Q02 (425) 257-8810 Planning Reference #: <br />1 Fit REV S20.00 Public Works Fee $: <br />1 T INS 4116r7. 2nn Other $: <br />OWNER NAME AND ADDRESS: CARD APPEI.4AhT NAME AND ADDRESS: <br />NEWTON KIGHT LLP HANSEN CONSTRUCTION INC <br />1820-32nd street 4701 W.GLENHAVEN DR. <br />EVERETT WA 98201 EVERETT WA 98203 <br />PHONE: 4252595106 PHONE: 4253439055 <br />TAX PARCEL ID # SITE ADDRESS: 1820 32ND STREET <br />DESCRIPTION OF PROPOSED WORK <br />REPAVING PARKING LOT <br />(101212012 11:04 AM BES) <br />REMOVE AND REPLACE TREES AND REPAVE PARKING LOT. <br />10/2/2012 <br />PW 1210-002 <br />$ 45.00 <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br />and Specifications. <br />3 Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br />4. PAVE PER CITY OF EVERETT STANDARD. <br />5. INSTALL EROSION CONTROL MEASURES PER CITY OF EVERETT STANDARDS FOR SMALL PARCELS. <br />&REMOVE EROSION CONTROL MEASURES UPON COMPLETION OF PROJECT. <br />7. DO NOT BLOCK SIDEWALK OR ALLEY AND KEEP OPEN FOR PEDSTRIAN TRAVEL. <br />8.NO DIRT, MUD, ROCKS OR DEBRIS TO BE TRACKED ONTO ROADWAY. <br />9. TREES PLANTING PER PLANNING DEPARTEMENT RECOMMENDATION <br />10. CONTACT CITY OF EVERETT INSPECTOR RANDY ALLEN (425)339-7403. <br />/o <br />for Con <br />FINAL INSPECTION Date <br />Approved as Constructed <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and <br />save harmless the City of Everett from any and all claims for <br />damages, costs, expenses, or causes of action that may arise <br />because of installation and maintenance of the improvement <br />or other right-of-way use hereto applied for and further agrees <br />to remove same upon notice from the City and to replace <br />public property damaged thereby. <br />/7 <br />S' lure of Applicant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br />PURSUED TO COMPLETION. THIS rERMIT I.1AY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PRO]Ecr OVER 90 DAYS DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.