My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004 32ND ST BASE FILE 2016-01-01 MF Import
>
Address Records
>
32ND ST
>
2004
>
BASE FILE
>
2004 32ND ST BASE FILE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2017 9:22:50 AM
Creation date
4/1/2017 2:58:39 PM
Metadata
Fields
Template:
Address Document
Street Name
32ND ST
Street Number
2004
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PFRMIT COh1MENTS <br />4. Connect side sewer per City Standard #601. <br />5. Connect side sewer per Cify Standard #'s 601, 602, 604. <br />6. Connoct all roo(top downspouts to lhe side sewer. <br />7. Connect rooftop downspouts to the drainage system provided for lhis lo;. <br />8. Rooftop runoff must be discharged to a roof dov✓nspoul infiltratlon system per City ef Everett Storm <br />Manual 3-2.6.2. The approximate size trench is 3.5' wide, 2' de�p and 25' long, See attachment for <br />more details. <br />9. The contractor must meet wilh the Public Works Inspector to discuss potential drainage routing prior to <br />beginning the proJect. <br />10. Install erosion control measures as determined by the Public Works inspector, such as sill fence, straw <br />bales, swales, or erosion blankets. <br />`_ 1�J Install erosion control measures per City of Everett Standards for smail paroels <br />�21 Remove erosion control measures upon completion of the project prior to final approvai of the permit. <br />13. All excavated material from foundation, sidewalk and driveways shall be hauled to an approved, <br />permilted site. No wastinc� of material is allowed on this building lot. <br />No dirt, mud, rocks or debris to be trecked onto roadway. ' <br />No building materials to be stacked on sidewalks and sidewalks lo be kept clean and open for <br />pedestrian travel. <br />Adjust waler meter box 1" above sidewalk grade. <br />P.emove and repiace curb, gutler and sidewalk as per City of Everett Standard Plan #'s 305A & 306 on <br />ihis proposal's (rontac�e as directed by lhe Public Works Inspector (i.e.'a�roqursed driveways�wl any <br />broken or damaged area must be replaced). <br />Install a Type I concrete driveway per City of Everett Standard #307. <br />Pave driveway frorn lhe fronl property line out to the street paving. <br />20. Contact the _ <br />sewer services. <br />21. <br />22 <br />Water District for connecting provisions for this buiiding's water snd <br />A catcli basin as per CI!y Standard Plan iW02 witfi a gas trap per Standard Plan #410 is required for the <br />parking area. <br />If a sewer pump system is lo be installed, ihe pressure Iine must discharge into a private manhole, lhen <br />gravlty flow across the public riglil-of-way. <br />23. A sprinkler syslem is required for this building in compliance witli the requiremenls of NFDA Standards <br />13D. <br />PVJCommenls <br />
The URL can be used to link to this page
Your browser does not support the video tag.