Laserfiche WebLink
Work Activity Work Order <br />Page <br />3 <br />3/1/2007 <br />11:05 <br />Issued <br />By <br />WMW — WARD, MICHAEL W. <br />Issued <br />Department <br />Pw PUBLIC WORKS <br />Date Issued <br />7/11/2006 <br />Fund <br />401 Account 5 Program 710 Function 119 <br />Activity 675 <br />Program <br />Title <br />CONVERT 3211 WAVE DR 710119675 <br />Work Order No <br />20061183 Project Activity Type CORRECTIVE MAINTENANCE Status PR <br />Date <br />7/11/2006 Time 12:41 Original WO Billing <br />Vehicle Costs <br />Type <br />Vehicle No <br />Description Hours Cost Billing Date <br />Billing Code <br />V <br />J0026 <br />1997 FORD 1 TON SVC TRUCK 3 20.7 07/1412006 <br />V <br />J0046 <br />1999 STERLING 5 YARD DUMP 3 47.7 07/1412006 <br />Total Vehicle Cost $68.40 <br />Material Costs <br />Type <br />Mater No <br />Description Quantity <br />Cost Billing Date <br />Billing C, <br />M <br />ADAP34000347 <br />ADAPTER 314 CST X 3/4 IPS INSTA-TITE 1 <br />9.595 07/14/2006 <br />M <br />ADAP340'J0547 <br />ADAPTER 314 MIP X 3/4 IPS INSTA-TITE 1 <br />9.395 07/1412006 <br />M <br />BOX000154347 <br />BOX METER MOLDED PLASTIC W/nl LID AND READER (SMAL1 <br />52.695 07/14/2006 <br />M <br />ELL034104247 <br />ELBOW 3/4 NPT 90 DEG STREET CAST BRASS (114 BEND) 1 <br />1.83 07/14/2006 <br />M <br />METE34141847 <br />METER 5/8 X 3/4 NEPTUNE W/PRO READ IN CU FT RADIO 1 <br />179.302 07/14/2006 <br />M <br />PIPE34060647 <br />PIPE W4 POLY IPS 10 <br />2.64 07/14/20G6 <br />M <br />SETT34033647 <br />SETTER COPPER 5/8 X 3/4 (HEIGHT 12) LEG LENGTH 15 1 <br />62.93 07/1412006 <br />Total Material Cost <br />$318.40 <br />NA Costs <br />Type <br />Na No <br />Description Quantity Cost Billing Date <br />Billing Code.___ <br />NA <br />NIA <br />METER NUMBER 80818373 1 0 07/14/2006 <br />Total NA Cost $0.00 <br />Personnel Costs <br />Type <br />ID <br />Name Hours Cost Billing Date Earning Code <br />Class <br />P <br />DKR <br />DAY, KEVIN R. 3 07/14/2006 <br />P <br />JGD <br />JACOBS, GREG D. 3 07/14/2006 <br />P <br />WDL <br />WEAVER, DEAN L. 2 07/14/2006 <br />Total Personnel Cost <br />Total Cost $545.53 <br />