My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2400 33RD ST 2018-01-02 MF Import
>
Address Records
>
33RD ST
>
2400
>
2400 33RD ST 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2022 11:55:02 AM
Creation date
4/1/2017 3:28:41 PM
Metadata
Fields
Template:
Address Document
Street Name
33RD ST
Street Number
2400
Notes
FOR EVERETT STATION SEE 3201 SMITH ST
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
844
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V. Site Lavatiun <br />VI. Site Information <br />She/Project Name <br />Everett Station Phase 2 <br />Total size of site: 5 auras <br />Street Address or Location Description (If the <br />project or site lacks a street address, indicate the <br />Total area of soil disturbance: §& acres (Enter the <br />general location of the site (e.g. Intersection of <br />estimated total area to be disturbed during the life of the <br />Highways 61 and 34)) <br />project, including grubbing, excavation, gradino, util9les <br />3201 Smith Ave, Everett, WA 98201 <br />and infrastructure Installation. Note: 1 acre = 43,560 /f <br />Type of project (Road, utilities, subdivision, private <br />home, commercial etc.) <br />Will the project Involve poured concrete? ® Yen ❑ No <br />Transit Center, Commuter Rail Station and Park <br />If YES, how many cubic yards wit be poured: 500 vd' <br />and Ride Lot <br />Attach a map showing location of new permittee's <br />will the project involve recycled concrete? ❑ Yes ® No <br />construction Slte(s). <br />It YES, how many cubic yards VAN be used: _ <br />Will the project involve er4neared soils (CTB, CKD, etc)? <br />Z Yes ❑ No <br />City (or nearest city) Everett <br />Estimated project start-up date: January 2007 <br />County Snohomish <br />Estimated project completion date: January 2000 <br />Record the latitude and longitude of the site. ' Record the latitude and longitude of main entrance to the site. <br />For projects without a main entrance (pipelines, roads, etc), record approximate center of site. <br />degrees, minutes, seconds degrees, minutes, seconds <br />Latitude 470 58' 26" N Longitude -1220 11' 41 W <br />For assistance with latitude and longitude refer to: http://cfpubi.eoa.aov/nodes/stormwaterMflong.clm <br />or www.topozone.com or http://www.epa.aovRrilreport/sitina tooYlrxlex.htm. <br />VII. Discharge/Receiving Water Information <br />your construction site's storm <br />❑ A stormwater infiltration structure with discharge to groundwater? (e.g., infiltration pond, dry well, regional <br />detention basin, etc) <br />® Directly or indirectly to a surface water body/water bodies (e.g. via stomp drain system, ioadside ditch, <br />pipe, etc)? <br />Provide locations below or attach separate sheet, if necessary. <br />Does your project include dewatering? ❑ Yes ®No <br />Dewatering plans and discharge locations must be included in the Stormwater Pollution Prevention Plan. <br />Some large construction projects (subdivisions, roads, pipelines, etc.) may discharge to several water bodies. <br />if the map does not provide a name of a creek or tributary, use a format such as "unnamed tributary to Bull Run <br />Creek. Please indicate the name of the receiving water body. (Attach a separate list for multiple water bodies.) <br />Are any of the water bodies designated as water quality impaired?* (i.e. is the water body 303(d) listed or <br />have a TMDL for turbidi , fine sediment, phosphorus or pH)?. Yes ® No <br />' For information on impaired water bodies, <br />ECY 020-87a (Rev 12/05) <br />
The URL can be used to link to this page
Your browser does not support the video tag.