Laserfiche WebLink
the owner of the utility can be identified, then the Contractor must also notify the owner immediately. If there <br />is any doubt about the location of underground cables or lines of any kind, no work must be performed until the <br />exact location has been determined. There will be no exceptions to these instructions. <br />• 1.07.03 All excavations must be conducted in compliance with applicable 0'-r1A regulations and, regardless of <br />depth, must be shored where there is any danger to tracks, strictures or personnel. <br />1.07.04 Any excavations, holes or trenches on the Railways Property must be covered, guarded and/or <br />protected when not being worked on. When leaving work site areas at night and over weekends, the areas must <br />be secured and left in it condition that will ensure that Railway employees and other personnel who may be <br />working or passing through the area are protected from all hazards. All excavations must be back filled as soon <br />as possible. <br />1.08 Hazardous Waste, Substances and Material Reporting <br />1.08.01 If Contractor discovers any hazardous waste, hazardous substance, petroleum or other deleterious <br />material, including but not limited to any non -containerized commodity or material, on or adjacent to Railway's <br />Property, in or near amy surface water, swamp, wetlands or watenvays, while performing any work under this <br />Agreement, Contractor must immediately: (a) notify the Railway's Resource Operations Center at 1(800) <br />832-5452, of such discovery: (b) lake safeguards necessary to protect its employees, subcontractors, agents <br />and/or third parties: and (c) exercise due care with respect to the release, including the taking of any appropriate <br />measure to minimize the impact of such release. <br />1.09 Personal Injury Reporting <br />1.09.01 The Railway is required to report certain injuries as a part of compliance with Federal Railroad <br />Administration (FRA) reporting requirements. Any personal injury sustained by an employee of the Contractor, <br />subcontractor or Contractor's invitees while on the Railway's Property must be reported immediately (by phone <br />mail if unable to contact in person) to the Railway's representative in charge of the project. The Non -Employee <br />Personal Injury Data Collection Fonn contained herein is to be completed and sent by Fax to the Railway at <br />I (817) 352-7593 and to the Railway's Project Representative no later than the close of shift on the date of the <br />injury. <br />Capital Pro;ecls Commuter Rail 6 <br />Everett Station Phase 2 EX111131T "C" <br />CONTRACTOR REQUIRMENTS <br />IF13 No. R'rA/CP 21-06 <br />Form 0102 Rev. 02/04 <br />