Laserfiche WebLink
Any insurance policy must be written by a reputable insurance company acceptable to Railroad or with a <br />current Best's Guide Rating of A- and Class VI or better, and authorized to do business in the state(s) in which the <br />service is to be provide. <br />Contractor represents that this Agreement has been thoroughly reviewed by contractor's insurance <br />agcm(s)/broker(s), who have been instructed by contractor to procure the insurance coverage required by this <br />Agreement Allocated Loss Expense must be in addition to all policy limits for coverages referenced above. <br />Not more frequently than once every five years, Railroad may reasonably modify the required insurance <br />coverage to reflect then -current risk management practices in the railroad industry and underwriting practices in the <br />insurance industry. <br />If any portion of the operation is to be subcontracted by contractor, contractor must require that the <br />subcontractor provide and maintain the insurance coverages set forth herein, naming Railroad as an additional <br />insured, and requiring that the subcontractor release, defend and indemnity Railroad to the same extent and under <br />the same terms and conditions as contractor is required to release, defend and indemnify Railroad herein. <br />Failure to provide evidence as required by this section will entitle, but not require, Railroad to terminate <br />this Agreement immediately. Acceptance of a certificate that does not comply with this section will not operate as a <br />waiver of contractor's obligations hereunder. <br />The fact that insurance (including, without limitation, self-insurance) is obtained by contractor will not be <br />deemed to release or diminish the liability of contractor including, without limitation, liability tinder the indemnity <br />provisions of this Agreement Damages recoverable by Railroad will not be limited by the amount of the required <br />insurance coverage. <br />For purposes of this section, Railroad means "Burlington Northern Santa Fe Corporation", "fhe Burlington <br />Northern and Santa Fe Railway Company" and the subsidiaries, successors, assigns and affiliates of each. <br />Section 4. EXIIIRIT "C" CONTRACTOR REQUIREMENTS <br />The Contractor will observe and comply with all the provisions, obligations and limitations to be observed <br />by Contractor which ire contained in the specifications of the Contract, entitled EXHIBIT "C", CONTRACTOR <br />REQUIREMENTS, including, but not be limited to, payment of all costs incurred for any damages to Railway <br />roadbed, tracks, and/or appurtenances thereto, resulting from use, occupancy, or presence of its employees, <br />representatives, or agents or subcontractors on or about the construction site. <br />Section 5. TRAIN DELAY <br />Contractor is responsible for and hereby indemnifies and holds harmless Railway (including its affiliated <br />railway companies, and its tenants) for, from and against all damages arising from any unscheduled delay to a <br />freight or passenger train which affects Railway's ability to fully utilize its equipment and to meet customer service <br />and contract obligations. Contractor will be billed, as further provided below, for the economic losses arising from <br />loss of' use of equipment, contractual loss of incentive pay and bonuses and contractual penalties resulting from train <br />delays, whether caused by Contractor, or subcontractors, or by the Railway perfonning work under this Agreement. <br />Railway agrees that it will not perform any act to unnecessarily cause train delay. <br />For loss of use of equipment, Contractor will be billed per freight train hour at an average rate of <br />(with annual adjustments) per hour per train as determined from Railways record. Any disruption to train traffic <br />may cause delays to multiple trains at floe same time for the same period. <br />Additionally, the parties acknowledge that passenger, U.S. mail trains and certain ol'ter grain, imennodal, <br />coal and freight trains operate under incentive/penally contracts between Railway ^nd its customer(s). Under these <br />arrangements, if Railway does not meet its contract service commitments, Railway may suffer loss of performance <br />Capital Projects commuter RAil EXHIBI "'C-I" IFB No. RTAJCP 21- <br />06 <br />Everett Station Phase 2 <br />Funn 0103 Rev. 02/04 <br />,s <br />4c- <br />