Laserfiche WebLink
TABLE OF CONTENTS <br />CSection 12100 Art <br />DIVISION 13— SPECIAL CONSTRUCTION (NOT USED) <br />DIVISION 14—CONVEYING SYSTEMS <br />Section 14210 Hydraulic Elevators <br />DIVISION 15 — MECHANICAL, PLUMBING AND FIRE PROTECTION <br />Section 15000 <br />Mechanical General and Special Provisions <br />Section. 15060 <br />Piping and Pipe Fittings <br />Section 15100 <br />Valves, Cocks and Faucets <br />Section 15140 <br />Supports and Anchors <br />Section 15150 <br />Motors, Starters, and Motor Controls <br />Section 15250 <br />Mechanical Insulation <br />Section 15400 <br />Plumbing Systems <br />Section 15800 <br />Hiding, Ventilating, and Air Conditioning <br />Section 15950 <br />Mechanical Controls <br />Section 15995 <br />Commissioning of Mechanical Systems <br />DIVISION 16—ELECTRICAL <br />Section 1601(' Basic Electrical <br />Section 16060 :.rounding and Bonding <br />Section 16070 Electrical Bangers and Supports <br />Section 16075 Electrical Identification <br />Section 16123 Building Wirc:md Cable <br />Section 16130 Raceway and Boxes <br />Section 16140 Wiring Devices <br />Section I6150 Wiring Connections <br />Section 16210 Electrical Utility Services <br />Section 16442 Panelboards <br />Section 16461 Dry Type Transformers <br />Section 16510 Interior Luminaires <br />Section 16520 Exterior Luminaires <br />Section 16613 Battery Inverter System <br />Section 16740 Voice/Data System <br />Section 16760 Intercom Systems <br />Section 16901 Electrical Sensing and Measurement <br />Section 16930 Contactors and Control Devices <br />Appendices ....... Appendix A: Overpass Agreement <br />BNSI' Fonn 0102 Exhibit C <br />BNSF Form 0103 C-1 <br />Appendix B: Hazardous Materials Report <br />Capital Projects Commuter Rail <br />Everett Station Phase 2 <br />TABLE OF CONTENTS <br />IFB No. RTA/CP 21-06 <br />